COUNTER BID UNDER THE STEERING GROUP'S SUPPLEMENTARY PROCEDURE FOR THE CONSTRUCTION AND EQUIPPING OF STAGES
4 OF THE HONG KONG MASS TRANSIT
RAILWAY
1
We are grateful to you for giving our representatives the opportunity of meeting with you at such short notice on the 21st November 1973.
This letter is written to confirm that we are indeed submitting a
counter bid for the purpose of the Steering Group's supplementary
procedure. In line with your request we now propose to restate our position in terms relating specifically to the Government's "Requirements" detailed in your letter dated August 1st 1973 as amended and amplified by discussion in London at the end of August and early in September. We confirm that the above Requirements are for the most part acceptable to the Anglo-Italian Group. In the majority of instances confirmation that the Requirements can be met has already been given separately by
the British and Italian Groups.
Apart from reiterating one or two points, we are therefore only commenting
in detail where confirmation was lacking before and where our response
is now eit her more positive or there are differences between the Italian and British positions. All Requirements not specifically mentioned below
(Paragraph numbers hereunder are
should therefore be considered as met.
those given in the Steering Group's document "Requirements to be met for
a single contract for the Mass Transit Railway").
1.
Consortium Organisation
(b) The Anglo-Italian Group wishes to dispense with the reservation
previously entered on behalf of the British Group in respect of
detailed civil works design capability.
It therefore affirms its
willingness to undertake detailed design based on the overall
system specifications laid down.