0001160 G.F. 316
SECRET
Government's Requirement
VIII.
Interface with Consultants
The consortium should be prepared to take over responsibility for detailed design as and when basic data and design parameters are available and performance specifications for E & M equipment are defined.
Yes
- 7-
Present Indications (as at 5th December 1973)
Japanese
Anglo-Italian
H.K.
etro Constructors
Yes
Yes
SECRET