0001160 G.F. 316

SECRET

Government's Requirement

VIII.

Interface with Consultants

The consortium should be prepared to take over responsibility for detailed design as and when basic data and design parameters are available and performance specifications for E & M equipment are defined.

Yes

- 7-

Present Indications (as at 5th December 1973)

Japanese

Anglo-Italian

H.K.

etro Constructors

Yes

Yes

SECRET

Share This Page