RESTRICTED

3 MORRISON HILL TECHNICAL INSTITUTE

PROPOSED FUTURE DEVELOPMENT.

ESTIMATE OF COSTS

APPENDIX

1. Proposed additional floor on workshop wing (6,000 sq ft approximately)

$(HK)

A. Construction costs say

350,000

B. Containing the following workshops

$(HK)

Est Cost of Equipment

1. Watch repairs and instrumentation

50,000

ii.

iii.

Mechanical fitting workshop

Basic teacher training workshop

50,000

150,000

iv. Mectrical installation

60,000

310,000

2. Textile Mechanics workshop

modifications to machine shop

Cost of equipment

300,000

3.

Mechanics laboratory workshop to be converted into

an electrical installations workshop

Cost of equipment

4. Cost of additional equipment required in existing

accommodation for technician education and advanced

craft work

Department

Business Studies

Calculators

Electrical typewriters

16,000

Micro filing equipment

Addressing machine

25,000

25,000

c/f 651,000 (Equipment

only)

RESTRICTED