3 MORRISON HILL TECHNICAL INSTITUTE
PROPOSED FUTURE DEVELOPMENT.
ESTIMATE OF COSTS
APPENDIX
1. Proposed additional floor on workshop wing (6,000 sq ft approximately)
$(HK)
A. Construction costs say
350,000
B. Containing the following workshops
$(HK)
Est Cost of Equipment
1. Watch repairs and instrumentation
50,000
ii.
iii.
Mechanical fitting workshop
Basic teacher training workshop
50,000
150,000
iv. Mectrical installation
60,000
310,000
2. Textile Mechanics workshop
modifications to machine shop
Cost of equipment
300,000
3.
Mechanics laboratory workshop to be converted into
an electrical installations workshop
Cost of equipment
4. Cost of additional equipment required in existing
accommodation for technician education and advanced
craft work
Department
Business Studies
Calculators
Electrical typewriters
16,000
Micro filing equipment
Addressing machine
25,000
25,000
c/f 651,000 (Equipment
only)