11 | 12
12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
Order and await berth No. 1 cranes (2 No.)
15
Erect and commission berth No.1 cranes
+22
MONTHS
2
4
5
6
7
8 9 10 11
PHASE I
Authorisation of reclamation
Start surfacing and buildings
12
Key:-
Continue
surfacing
124
Start
event
End event
Activity
2/2
Years
(the duration of each activity is indicated
in months)
Finish main
Finish main
Finish drive
seawoll dredge
seawall
sand
concrete
plies
Finish maln
seawall rubble
--- TEE
107
Start
Start
main
seowoll
'stawa}) }
dredge
sand
Start "drive concrete piles
Start main seawall
rubble mound
Start main
seawall
Finish main seawalli
Finish reclamation
Finish surfacing and open berth Noll,
101
103
108
119
123
(25)
126
Finish return seawall
dredge
Start retur isand)
105
Start return
seawall rubble
2
Start
return
Seawall
Finish return seowoll
[109
13
Start precost
piles
102
3
Finish
return
06 and
Finish
1
Finish
return
110 Cubble
Pre-reclamation
dredging
precast Start precasting
piles
decking
1
[12
Dredge
berth No. approaches
Design and let contract
7
001
003
PHASE 2
MONTHS
2 3 4
ENGINEERING REPORT
CONTAINER TERMINAL
KWAI CHUNG
On
5 6
7
8
Finish precasting
decking members
117
Start reclamation
120)
120
Start
decking
Finish
118
decking
3
Dredge barth No. 2 approaches
Dummy (logical link or constraint not representing
a specific operation)
Spare time (float) available for an activity
Time to key event
Critical path to key event (heavy line)
Notes:-
I.
Direction of arrows indicates sequence.
2. (1) [101] LO 126
are Phose | events.
Continue front
27
reclamation
3
221
Finish front
reclamation
3
3 Years
Finish surface
224
(1)
[201] to [227
ore Phose 2 events.
3
(1)
(001) to 003) are common to both phoses.
Order and await
Sheet piles
Start sheet piling
Finish sheet piles
Finish dredge
cells
Finish drive concrete
piles
„Pinish fill cell
₤202
(20
209
215
216
7
Start dredge
cells
Stort
Stort drive concrete piles
celis
208
201
214
Start precasting piles,
Finish precosting piles
201
-203
Stort
crone beans
218
•
Finish crane
beams
Surface cells and open berth No. 2
223
225
3.
To be read in conjunction with Drawing 16.
4. Activities (003) to [219] and 219 to 225,
only included if odditional cranes required -- para. 15.6 (†) reters.
32
Years
Reclamation behind breakwater
Sand drains
Consolidation
Surfacing and behind existing
buildings breakwater
Complete and clear sits
206
213
222
226
221
12
Pre-rectomation
dredging
Start front
reclamation
Excavote in existing breakwater
204
6
Stort surfacing and packing shed
5
[212
Continue surfacing and finish pocking shed
2
Access flyover
18
Order and awalt berth No. 2 cranes (2 No.)
15
* See note 4
Erect and commission berth No.2 cranes
(219 Jun
7
9 10 11 12 13 14 15 16 17 18 19 20 21 | 22 | 23 | 24 | 25 | 26 | 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
PROGRAMME
NETWORK
FOR
STAGE
I
PORT WORKS DIVISION
P. W. D. HONG KONG
20