Chapter

6.

DESIGN CRITERIA

6.1

Method of Operation

6.7

Berths

6.10

Working Apron

6.15

Marshalling Area

6.21

Packing Stations

6.27

Number of Berths

Page

18

18

19

19

20

21

7.1

7.6

7. TYPES OF QUAY STRUCTURE CONSIDERED

Concrete-Block Seawall

Concrete Caissons

7.11

Independent Piled Structure

25

7.16

Piled Structure with Sheet-Pile Bulkhead

26

7.21

Piled Structure with Concrete-Block Seawall

27

* * * * ~

23

24

7.26

Cellular Steel Sheet Piling

28

8.

RECOMMENDED DESIGN AND LAYOUT

8.1 Design Assumptions

8.3

Quay Alignment

8.5

Layout

8.19

Quay Structure

8.27

Marshalling Area

8.32

Packing Stations

8.35

Lighter Berths

8.38 Road Access

2 2 2 7 8 3 3 3 2

29

29

29

31

32

33

33

34

34

8.44 Sea Approaches

9. STAGES OF CONSTRUCTION

9.1

General .

9.2

Stage 1

9.7

Stage 2

9.9

Stage 3

10. RECLAMATION

10.1

Settlement

10.12 Mud Replacement

10.17

Sand Drains

10.20 Paper Drains

10.24 Surcharging

10.30

Recommended Methods.

10.36 Quantities

11. SOURCES OF FILLING MATERIAL

11.1 Government Development Schemes

11.3

Public Dumping

11.14

Incinerator Ash

11.6

Borrow Areas on the Mainland

11.19

Borrow Areas on Tsing Yi Island

11.27 Dredging

11.30

Recommended Sources

wwww

36

36

36

37

41

* £ £ £ * ww

38

39

42

42

44

45

47

47

47

48

49

50

50

iv

Share This Page