LIST OF CONTENTS
Page
1
Chapter
1. SUMMARY
1.1
Recommended Scheme
1.8
Costs and Timing
►
1.9
Land and Sources of Fill
1.11
Settlement of Reclamation
1.13
Weather Effects
1.15
Maintenance Dredging
1.16
Methods of Operation
1.18
Number of Berths
1.22
Road Traffic
1.23
Land Sale Conditions
I
2
2
3
3
3
2 3 3 3 3 en
2. INTRODUCTION
Background
The Container Committee
2.1
2.6
2.10
Terms of Reference
2.12
Method of Approach
4
4
5
6
3. THE SITE
3.1
Geography
3.5
Geology.
3.9
Tides
3.14
Currents.
4. SITE INVESTIGATIONS
4.1
Sounding Surveys
4.4
Marine Borings
4.6
Geophysical Survey
4.8
Current Survey
4.10
Wave Observation
4.14
Silt Load Measurement
4.16
Borrow Area Investigations
4.19
Test Piles
7
7
7
8
9
9
9
9
10
10
10
11
5.1
5.3
5. FACTORS AFFECTING DESIGN AND LAYOUT
Practical Limits for Alignment of Berths
Availability of Filling Material
12
12
5.5
Dredging of Berths and Approaches
12
5.7
Area required.
12
5.10
Road Access
13
5.11
Wind
13
5.17
Waves
14
5.35
Currents.
15
5.36
Silting or Scouring.
15
5.39
Desalination Plant
16
5.42
Mass Transport Railway
16
iii