- 3-

7) Direct labour (excluding bleaching and dyeing)

(1)

Manufacturing processes

(2)

Labour cost per dozen

(3)

Labour cost per sq.yd.

(7(2) divided by 2)

f)

h)

i)

j)

8) Overheads

Total:

(1)

Total overheads incurred during period

(2)

Total D/L costs

to

(3)

overheads to

D/L

(4)

% overheads to D/L

claimed (not to

exceed 35%)

Actual % of

(excl. bleaching and dyeing) during period. named (8(1))

Appendix VI

H.K. cost per sq.yd.

for direct labour (7(3))

$

H.K. cost per sq.yd.

for overheads

(7(3) x 8(4))

Total H.K. cost per sq.yd.:

$

Share This Page