- 3 -
7) Overheads
(1)
Total overheads incurred during period
to
(2)
Total direct labour costs during period named in 7(1)
(3)
Actual % of overheads to
D/L
(4)
% Overheads to D/L
claimed (see Appendix IV paragraph 6)
8) Special cutting and processing charges for corduroy specified in 3(1)
Total H.K. cost per sq.yd.:
Appendix V
K.K. cost per sq.yd.
for overheads (6(3) x 7(4))
H.K. cost per sq.yd.