- 3.
7) overheads
(1)
Total overheads incurred during period
to
(2)
Total direct labour costs during period named in 7(1)
(3)
Actual % of overheads to
D/L
(4)
% Overheads to D/L
claimed (see Appendix IV
paragraph 6)
Total H.K. cost per sq.yd.:
3
Appendix
H.K. cost per sq.yd.
for overheads
(6(3) x 7(4))
Page 45Page 46