RESTRICTED
(i) Projects costing less than £10,000
A short background note only is needed for describing
the project and covering the following points:-
(a) Is the project included in the approved development
plan?
(b) Benefits to be dervied from the project,
economic and social.
(c) Location of the project and reasons for its choice
(a) Total cost of project, amount of British aid required
and over what period. (U.K. financial years)..
(e) When the work will begin.
(ii) Projects costing between £10,000 and £100,000
A more detailed description of the project should be given
covering points (a) to (e) in (i) above together with the
following:-
(f) Why is the project being put forward at this time?
(6) How will the operating costs be financed when
the project is completed?
(h) The agency responsible for construction and whether
the project will be put out to tender.
(iii) Projects costing over £100,000
The description of the project should cover all the
points listed at (a) to (h) above, together with the following:
(i) Whether consultants will be used (i) in the
design stage and (ii) to supervise construction or if not,
how construction will be supervised.
(j) Availability or proposed provision of power, water
and other services.
In dealing with (b) 'benefits to be dervied from the project'
information should be given covering both direct benefits e.g.
sales of products, increase in Secondary School places, additional
hospital beds etc. and indirect benefits, e.g. increased revenue
4