The Cross Harbour Tunnel

1. Cost of the Tunnel

Contract Cost (25% of $230 million

£15.8 million)

Interest on Promissory Notes

during construction

Government Roadworks

Consulting Engineers

(25% of $12.3 million $3.075

add already paid

7.700 $10.775)

Other Expenses

Further Contingencies

Dollars

equivalent

57.5m.

4m.

13.0m.

0.9m.

6.0m.

0.40.

10.8m.

0.74m.

4.5m.

0.3m.

2.2m.

0.16m.

Total

$94.0m.

£6.50.

2. Equity capital of Cross-Harbour Tunnel Co. Ltd.

Equity Capital will be raised as follows:-

As percentage

Dollars

equivalent

of total

Wheelock Marden & Co. Ltd.

21.6m.

1.5m.)

52.7%

Hutchison International Ltd.

21.6 .

1.5m.)

Hong Kong Government

20.5 m.

1.4m.

25%

Hong Kong and Shanghai Banking

Corporation

11.0 a.

0.74 m

13.4%

Kwong Wan Ltd.

5.9 m.

0.4 m.

7%

Sir Elly Kadoorie Successors

1.4 m.

0.1 m.

1.7%

Total

$82.Om.

25.64m.

Add Government Loan

120.

0.83m.

Grand Total

$94m.

£6.5m.

N.B.

While the Hong Kong Bank have agreed in the past to take 10% equity which was at that time equivalent to $11 million, as yet they have not been asked to invest the same amount on the reduced total capital. If they were to insist(as have the Hong Kong Government) on a 10% share only, then a further $2.8million would have to be found elsewhere.