CONFIDENTIAL

6.

For Bangkok and Saigon only. required for loading in rivers:

Information

(1) Water quality characteristics, as in my immediately

following telegram, which shows maximum acceptable standards of raw water for our treatment plant, at 1-hour intervals for a 24-hour period, at point or points where tankers of 20,000 or 70,000 tons could load.

(11) Information on known or likely variations in

water qualities at loading points arising from seasonal variations (weather, river flow, tidal cycle) over six months from 1 October.

7. For Saigon only. Would loading at Camranh Bay

or other east coast port be feasible,

Distribution

<

H.K. WID 'C' I.G.D.

J.I.C. External Distribution

DEPARTMENTAL DISTRIBUTION

Copies also sent to:-

P.S. to Prime Minister Cabinet Office

Foreign Office

#1

#

11

ti

11

11

D.I.O., J.I.R. P.S. to Mr. Rodgers Mr. de la Mare Mr. Bolland

Mr. Wilson

Mr. Denson

J

#1

F.0./C.0. (I.P.G.D.)

# (I.R.D.)

Treasury

Export Credits Guarantee Dept.

Ministry of Defence (Rm. 7365)

香港

#1

#1

tf

11

"

Rm. 7163)

11

Rm. 5131

Board of Trade

#1 (CRE 4)

Commonwealth office (News Dept.

Hong Kong Government Office

Foreign Office

(News Dept.)

Mr. Foggon

Mr. Littlejohn-Cook Mr.

J.H. Peck

Mr. D. Hawkins

Mr. C.P. Rawlings Mr. Henn

Major Koe

M.0.2.

Mr. J.A.B. Darlington Mr. B.E.P. MacTavish Mr. M. Glover

Duty Officer Mr. P. Sedgwick

CONFIDENTIAL

Share This Page