CONFIDENTIAL
6.
For Bangkok and Saigon only. required for loading in rivers:
Information
(1) Water quality characteristics, as in my immediately
following telegram, which shows maximum acceptable standards of raw water for our treatment plant, at 1-hour intervals for a 24-hour period, at point or points where tankers of 20,000 or 70,000 tons could load.
(11) Information on known or likely variations in
water qualities at loading points arising from seasonal variations (weather, river flow, tidal cycle) over six months from 1 October.
7. For Saigon only. Would loading at Camranh Bay
or other east coast port be feasible,
Distribution
<
H.K. WID 'C' I.G.D.
J.I.C. External Distribution
DEPARTMENTAL DISTRIBUTION
Copies also sent to:-
P.S. to Prime Minister Cabinet Office
Foreign Office
#1
#
11
ti
11
11
D.I.O., J.I.R. P.S. to Mr. Rodgers Mr. de la Mare Mr. Bolland
Mr. Wilson
Mr. Denson
J
#1
F.0./C.0. (I.P.G.D.)
# (I.R.D.)
Treasury
Export Credits Guarantee Dept.
Ministry of Defence (Rm. 7365)
香港
#1
#1
tf
11
"
Rm. 7163)
11
Rm. 5131
Board of Trade
#1 (CRE 4)
Commonwealth office (News Dept.
Hong Kong Government Office
Foreign Office
(News Dept.)
Mr. Foggon
Mr. Littlejohn-Cook Mr.
J.H. Peck
Mr. D. Hawkins
Mr. C.P. Rawlings Mr. Henn
Major Koe
M.0.2.
Mr. J.A.B. Darlington Mr. B.E.P. MacTavish Mr. M. Glover
Duty Officer Mr. P. Sedgwick
CONFIDENTIAL