BEDROO
STS AM
BEDROOM | BEDROCH,
BEDROOM
- SITTING AR
ENTRANCE
ENTRANCE
LIFT
Eighth floor (medical staff block)
VERANDAN
UK ORS
CORRIDOR
Contractors
Contractors and sub-contractors in-
cluded:
Main contractor-On Lee Co.
Substructure-Hsin Heng Construc-
tion Co.
Piping services-Haden
Ltd.
Gilman
Air conditioning and ventilation—
American Engineering Corp.
Lifts Otis Elevator Co.
Medical gases pipeline installation Hong Kong Oxygen and
Acetylene Co. Ltd-
Town gas supply-Hong Kong
and China Gas Co. Ltd.
Sterilizing equipment
Trading Co.
Swedish
Electrical installation and boilers-
British General Electric Co. Ltd.
Bricks
Fook Wah Enterprises
Ltd. Mosaics Hung Tat Co.
PASIË
JV
Door locks and closers
Heng Trading Co.
Wing
SERICE HO
от
Ground floor (married quarters)
Cellocrete Cellocrete Building
Service Ltd.
Plastic foam Hong Kong Plastic
Foam Mfg. Co.
Cement
J
Wang Fong Co.
Sanitary fittings Lee Yu Kee
Ltd. and Shun Shing Co.
Asphalt roofing Dreyer and Co.
Ltd. and Vai Cheong Co.
Aluminium Secure Traders Ltd.
Tiles
Ltd.
―
Tsing Yi Island Industries
Other building materials:-
William Jacks and Co. Ltd.
Davie, Boag and Co. Ltd.
Yukon Enterprises Ltd.
Indo China Trading Co. Ltd. Duro Industries Ltd.
Gilman and Co. Ltd. Hutchison (Building) Ltd.
Precast Concrete Products Ltd.
JU
COVERS FEMALE
:
Typical floor (married quarters)
322
52
Ca
MEET
1
BEŞTEA DESCH
Far East Architect & Builder September, 1967