AU

stream,

Stages III & IV

seawater with water of sufficiently low from the tunnels and the Chung Mei salinity to be acceptable for normal domestic use. It is easily seen that straight dilution would take a consi- derable time and waste freshwater in- flow; in order to reduce the time required for dilution and to conserve water. most of the seawater pumped from the cove before fresh- water was diverted into it. A further problem will arise as the salinity of the water trapped in Plover Cove is reduced; salts from the pore water in the sea-bed mud will diffuse into the fresher water above.

was

The effect of this diffusion has been calculated theoretically and, in order to simulate actual conditions, field lests were carried out using 10 in. and 48 in. dia. welded pipes sunk vertically into the sea-bed and, in ad- dition, laboratory tests were made in tanks up to 6 ft. dia. Good correla- tion was obtained between the theore- tical, field and laboratory results.

The many biological changes in- herent in the salt/brackish fresh water conversion will continue to be studied until the freshwater regime is estab- lished. The rapid lowering of salinity from about 33,000 p.p.m. in early 1967 to roughly 300 p.p.m. in the autumn of 1967 will kill most of the marine animals and plants in the re- servoir area. To reduce the amount of decaying matter, as much as pos- sible of the fish and plant life were removed during the periods of draw- down and subsequent dilution. The establishment of a freshwater regime will be speeded up by controlled stock- ing with selected fish and by the natural movement of freshwater an- imals and plants into the reservoir

Preliminary investigation and design work for stages III and IV has already been undertaken. However, construc- tion of these stages, which will utilize the extensive catchment areas to the south of Tolo Channel and east of Tide Cove, has not been authorised.

APPENDIX 'A'

PLOVER COVE WATER SCHEME STAGES I & II PRINCIPAL STATISTICS

Dams

PLOVER COVE MAIN DAM

Crest length Crest level

Max. construction

height

Av. depth of mud

dredged

Av. level of mud

Av. level of foundation Quantity of dredging Quantity of decom-

-74 ft. P.D. 7,000,000 cu.yd. 7,500,000 cu.yd.

Max. construction

height

60 ft.

PLOVER COVE SOUTHERN SUBSIDIARY DAM

Crest length

Max. construction

height

LOWER SHING MUN DAM

Crest length Max. height

Bellmouth spillway Spillway capacity

Reservoir capacity

Reservoir area

Quantity of materials

690 ft.

50 ft.

750 ft.

186 ft.

160 ft. dia.

20,000 cusecs

910 m.g.

57 acres

1,600,000 cu.yd.

LOWER SHING MUN SUPPLY BASIN

DAM

Length

Crest length

247 ft.

Max. height

47 ft.

Basin capacity

$ m.g.

LAU SHUI HEUNG IRRIGATION DAM

Crest length

140 ft.

Max. height

78 ft.

Reservoir capacity

27 m.g.

6,800 ft.

Reservoir area

8.2 acres

+36 ft. P.D.

HOK TAU IRRIGATION DAM

Crest length

200 ft.

127 ft.

Max. height

65 ft.

Max. height above

sea-bed

Reservoir capacity

32 m.g.

77 ft.

Reservoir area

7.1 acres

Max. depth of mud

dredged

56 ft.

RIVER INDUS FABRIDAM

107 ft.

41 ft.

-33 ft. P.D.

Height (fabridam only) Basin capacity

9 ft.

6 m.g.

TAU PASS FABRIDAM

65 ft.

5 ft.

1 m.g.

TAI PO TAU FABRIDAM

Length

125 ft.

Height (fabridam only) Basin capacity

12 ft.

62 m.g.

30,000 m.g.

Tunnels, Shafts & Culverts

Reservoir max. length

2,950 acres 31⁄2 miles

PLOVER COVE NORTHERN SUBSIDIARY DAM

Crest length

Section *River Indus to

Dia. (ft.)

Length (ft.)

650 ft.

Twin-42

20,400

FIG. 2

posed rock filling Quantity of rock fill Quantity of sand filling Spillway level Spillway length Spillway capacity Reservoir gross

capacity Reservoir useful

capacity Reservoir area

1,250,000 cu.yd. 2,250,000 cu.yd.

27 ft. P.D. 800 ft.

40,000 cusecs

39,000 m.g.

Length

Height (fabridam only) Basin capacity

NORTH-SOUTH SYSTEM

Tau Pass pipeline

CATCHWATERS

+94

TORAGE

STORAGE TO SUPPLY

E

+410

TAI MEI TUK

TAI MEI TUK

PUMPING STATION?

CATCHWATER

BA

TAU PASS CULVERT

TUNNELS AND INTAKES

+67

BC

STORAGE

PLOVER COVE

RESERVOIR

CA

M.S.L. +4

POSSIBLE

FUTURE

FROM STAGES

SOURCES

MAKE

Far East Architect & Builder October, 1967

+53

TAU PASS FABRICAM

(LOW LIFT)

RIVER INDUS PUMPING

STATION & FABRIDAM

то

TẠI LAM CHUNG

RESERVOIR

(HIGH LIFT)

CHINESE WATER

PLOVER COVE WATER SCHEME

DIAGRAMMATIC LAYOUT

59