In common with all dwellings in Hong Kong's Peak district the blocks are subjected to excessive humidity during the early part of the year and all internal wall plaster has a rough cast finish to reduce condensation. Fibreglass is used for underfloor sound insulation and floors are finished in teak parquet flooring.
The main entrance hall walls are finished in a colourful mosaic pattern and the terrazzo floors have “stepping- stones" of carborundumised granoli- thic panels to counteract the slippery effect of excessive condensation. Free standing aluminium letter boxes are provided in each entrance hall.
External works included driveways, covered parking areas, a substation, garden walling and sitting-out areas.
Contractors
Site formation and sub-structure
Yee Lee & Co.
struction Co.
Main contractor
Metal windows
Sang Hop Con-
Canton Metal
Window Mfg. Co. Ltd.
Aluminium doors and windows
Goodman Aluminium Corp. Ltd.
Gilman Engineers Ltd.
Lifts
Entrance hall showing
non-slip floor panels and letter boxes
Far East Architect & Builder October, 1967