OTIS ELEVATOR COMPANY
HONG KONG & SHANGHAI BANK BUILDING
THIRD FLOOR
TEL. 30932
HN KING
RECOGNIZED
BY
ARCHITECTS. EN-
GINEERS AND BUILD-
ING
MANAGEMENTS.
AS THE ONLY SYSTEM
OF ELEVATOR OPERA-
TION
THAT
WILL
EFFEC-
Peak-Period
SIGNAL-CONTROL
Gearless Passenger Elevators
FUNCTION
TIVELY FOR ALL CON-
DITIONS OF TRAFFIC
FLOW.
After a corridor button has once been pressed, it positively will stop the first elevator available approach- ing the landing in the proper direction.
Car and hoistway doors open automatically as soon as the car arrives in the landing zone and with no action on the part of the attendant.
False and unnecessary stops are completely eliminated.
The excellent service rendered by Signal-Control is not dependent upon the mental or physical qualifications of the attendants.
i
Advance lighting of hall lanterns indicates to waiting passengers which car will surely respond to their call and they can be ready to enter as soon as the car arrives.
The elimination of unnecessary stopping and starting prolongs the life of the entire elevator plant and reduces the power consumption to a minimum,
Branch Office
OTIS ELEVATOR COMPANY
035
Peking Road West
Shanghal. Chlua
142 13th. Street
Port Area
Manila. Philippines
32
5 Malacca Street
Singapore
1
Page 25Page 26