alignments must be determined.
A program called the Digital Ter- rain Model has been developed to enable road designers to obtain earth- work quantities. Various alignments can be applied to a given band of ter- rain data and the effect of modifica-
tions to the plan and profile can be assessed with great speed to identify the most economical layout.
Using this program on the Univac
1107 computer. the consultants an- alysed the alignments and earthworks for a proposed high capacity dual three-lane road between Tsuen Wan and Castle Peak, New Territories, to obtain the most economical design. Flyover beam design
The design of prestressed concrete beams depends partly on the cross section properties of the beam. It is
not difficult to calculate these but as it involves several steps, the calculation is time-consuming and prone to arith- metical errors.
A program for calculating section properties has been written for the Olivetti 101. The section is first divid- ed into rectangles, and the depth and breadth of each rectangle is then fed into the computer, which prints out the required information, including
ONIGNOOS
RUBBLE MOEND |
D3 Te CH, 1176 BI \ĈI TIU TO C/P (409
RUBBLE Mould
CH. 736 96 1176
10
CONSO
429
ONIONLIG
432
SET IKYT
CF 720 TH 1176
•
[462]
421
[422]
PVO FILL
DIV CLAK SECT 2
TIDY UP OPEN SP AREA
423
(428)
432
430 431
SIT INVT ci 714 To C/P
CONNECT BUST 6.
NEW CALVERT
PWO FIL, DIY CRAN SECTI
[417]
415
419
CONSOLIDATION
12
42-
[504]
SOUNDING
319
310
#WO FILL
SET INVT.
CONSOLIDATION
Dà TACŨ 176/
DIY, CHAK SICT. 3
(410
(411 412)
415
(414)
415
CONSOLIDATION
12
416
+
PWO FILL CANAL AND
[215
[(616)
413
002
(424
AREA FOR RD. WK.PH.3 ŪSĄ, EXCEPT DIY CIAN, SECT | 79425)
CONSOLIDATION
12
426
10
EXTRACT FROM NETWORK FOR WATERFRONT ROAD PROJECT
(SIZE OF THE FILL HETWork is too LARGE TO PRINT >
Extract from network for Waterfront Road project (size of full network is too large to print)
1.C.T. 1900 SERIES PERT
18/10/68
OUTPUT SHEET NUMBER
PROJECT WR WATERFRONT ROAD
RUN
1
TIME NOW 3JUN68 PAGE
S/P
CDE
PREC EVENT
SUCC
EVENT
REPORT CODE
DESCRIPTION
CB
407
408
SOUNDING
DUR EARLIEST EARLIEST
START FINISH 3MAR69
LATEST START
LATEST TOT FINISH FLOAT
FREE
E FLT
CB
408
309
DUMMY
1 24FE869 0 3MAR69 3MAR69
24FE869
3MAR69
0
10MAR69
10MAR69
1
св
408
424
DUMMY
0
CB
408
429
CB
409
410
RUBBLE HOUND CH 726 TO RUBBLE MOUND D3 TO CH
1176
1176
3MAR69 3MAR69 10 3MAR69 10 6JAN69
3MAR69
3MAR69
0
12MAY69, 17MAR69
23 JUN69
1 SEP69
16
6 JAN69
17HAR69
0
CB
610
411
CB
411
412
& CH 726 TO C/P CONSOLIDATION SOUNDING
6 17MAR69
28APR69
1 28APR69
CB
412
413
Ca
413
414
SET INVT D3 TO CH 1176 DUMMY
4
5MAY69
5MAY69 2JUN69
17MAR69 28APR69
28APR69
0
SHAY69
0
5MAY69
2 JUN69
0
0
2 JUN69
2 JUN69
CB
413
433
CB
414
415
Св
414
417
SET INVT CH 726 TO C/P
PHO FILL DIV CHAN SECT 3
DUMMY
3
2JUN69
28JUL 69
$ 21 JUL69
0 21JUL69
18AUG69 21JUL69
28 JUL69 2JUN69 8SEP69 28JUL 69
28JUL69
8
28JUL69
0
60CT69
7
28JUL69
1
Св
415
319
DUMMY
СВ
415
416
CB
416
616
CB
417
418
CB
418
419
Св
419
420
се
419
422
C8
420
613
CONSOLIDATION
DUMMY
LINK EXIST & NEW CULVERT PWO FILL DIV CHAN SECT 1 CONSOLIDATION
DUMMY
DUMMY
6 28JUL69
6 8SEP69
12 200CT69
CB
421
422
DUMMY
0 22SEP69
CB
422
423
PWO FILL DIV CHAN SECT 2
6 200CT69
0 18AUG69
12 18AUG69
18AUG 69 10NOV69
0 10NOV69 10NOV69
0 2000T69 0 12JAN70
853969 200CT69 12JAN70 200CT69 12JAN70 22SEP69 1 DEC69
26JAN70 60CT69 29 DEC69 28JUL69
8 SEP69 200C169
26JAN70 29DEC69 29DEC69 8SEP69 200CT69
23
7
0
12JAN70
15DEC69
12 JAN70
15DEC69
15DEC69 12JAN70 15DEC69
8
0
12
15 DEC69
26JAN70
B
CB
423
428
CB
424
425
CB
425
426
TIDY UP OPEN SP AREA PWO FILL FOR RD WK PH 3 & 3A
EX DIV CHAN SECT 1 TO 4 CONSOLIDATION
4
10
1 DEC69 3MAR69
29 DEC69
12MAY69
26JAN70 23FE870 3MAR69 12MAY69
8
0
12 12MAY69
CB
426
215
DUMMY
0 4AUG69
4AUG69 4AUG69
12MAY69
4AU669
600169
60CT69
9
CB
426
605
DUMMY
0 4AUG69
CB
426
610
DUMMY
0
CB
427
401
PREPARE CAST YARD
11
СВ
428
002
DUMHY
0 29DEC69
4AUG69 3JUN6&T
19AUG68 29DEC69
LAUG69 4 AUG69
60CT69
60CT69
9
4AUG69
LAUG 69
0
17FE869
5MAY69
37
23FE870
23FFC70
8
CB
429
430
CONSOLIDATION
6 12MAY69
CB
430
431
SOUNDING
1 23JUN69
C6
431
432
DUMMY
0 30JUN69
Co
432
421
SET INVT CH 726 TO 1176
8 28JUL69
23 JUN69 30JUN69 30JUN69 225EP69
1SEP69 130CT69
16
130CT69 200CT49
16
200CT69 200CT69
16
2000169 15DEC69
12
CB
433
417
DUMMY
0 28JUL69
28JUL69
28JUL69
28JUL69
0
CB
433
432
DUMMY
0 28JUL69
CB
501
502
WAIT FOR SITE IN C/P
24 3JUN68T
28JUŁ 69 18NOV68
2000T69 15 JUL68
200CT69
12
30DEC6
6
CB
502
503
CONST CULVERT IN C/P B
20 18NOV68
CB
503
504
CB
504
417
CONST CULVERT IN C/P A DUMMY
10 7APR69
7APR69 16JUN69
30DFCG8 19MAY69
198AY69
6
28JUL 69
6
CB
505
506
LAY 48 IN DEA DRAIN IN GT
24
0 16JUN69 16JUNG9 3JUN681 18K0V68
28 JUL 69
28JUL 69
6
28JUI 69
1.'JAN70
60
GEORGE ST
CB
506
612
DUMMY
0 18NOV68
18NOV68
12JAN70 12JAN70
60
60
CB
601
602
RD & ASSOC WK PH 2
18 9DEC68
14APR69
2000169 23FED70
45
СВ
602
002
DUMMY
0 14APR69
14APR69
23FEB70
74FE870
45
45
CB
603
604
CB
604
002
Computer print out of part of time schedule for Waterfront Road
28 5JAN69
0 21JUL69
21JUL69 21 JUL 69
RD & ASSOC WK PH 1 DUMMY
11 AUC 69
23FE070
23FEB70 23FCB70
31
0
31
31
38
Far East BUILDER, July 1969