Details of the ground floor parking space and portico.
General Contractors: Paul
Construction Co.
Schlage Locks: Shewan, Tomes &
Co., Ltd.
"Rooftex" Y.
Treasury Services, as well as Radio, white and the resulting effect is very Film and Publication sections are attractive. located on the second floor. On the third are the offices of the Army Liai- son Officer, Administration and Poli- tical, Commercial and Economic sec- tions.
There is a penthouse storey cover- ing the whole of the Albert Road wing which houses the Office of the Consul General. It has a large ad- joining reception office, the Secre- tary's office and Deputy Chief's office as well as a large conference room.
Two Otis passenger elevators are incorporated in the building, both operating at a speed of 300 feet a minute; however, one has a loading of 3500 lbs. and the other 2500 lbs. These serve all floors from the base- ment up to the fourth. Due to special freight requirements between the ground floor and the basement, a freight elevator with a capacity of 2500 lbs., operating at 20 feet a minute, has been installed. The archi- tects have taken the bold step of painting all of the cabs and the doors
Rock Asphalt Roofing & Felt Membrane Tanking: Dreyer & Co., Ltd.
Marblework: Raoul Bigazzi. Plumbing: Lee Yu Kee. Electrical Installation: The British
General Electric Co., Ltd. Elevators: Otis Elevator Company. Crittall Windows: Dodwell & Co.,
Ltd.
DUCT
Synthetic Resin Base Emulsion Finish: Duro Paint Manufacturing Co., Ltd.
Worthington Air Conditioners: Yee
On Hong Co., Ltd.
Ground floor plan
Jon
+
L C
PLATFORM
OFFICE
PREIGHT
LIST
STORE
*
EXAM.
DUCT SHAFT
EXAML
LIFT
DOC.
P ARKI NI G
SPACE
WAITING NURSE
LOBBY
¡SWITCH BOARD
POATIC
FOYER
Two photographs of the interior of the building
28