RUBBER RESEARCH INSTITUTE BUILDING
Architects: Iversen & Van Sitteren.
THE new building housing the
office and laboratories of the Rubber Research Institute of Malaya in Ampang Road, Kuala Lumpur, was designed to provide urgently required additional office space for the Botanical Division, Estate Advi- sory Services, Photographic Division, and Administrative Services.
The ground floor contains labora- tories, offices and a herbarium for the Botanical Division, together with a conference room and studio for plant photography. A ramp for bringing in plants is provided facing the glass houses of the Institute.
The conference room has a seat- ing capacity of 104 persons. The studio is also used as a projection room for film shows in the con- ference room. The lower section of this room is also used for staff conferences.
On the first floor are located the offices for estate and smallholders' advisory services and administrative staff, a drawing room for the pre- paration of the Institute's publication material, and developing and printing rooms for the photographic section. The building is fully air-con- ditioned.
48
JA
EXEC.
Elevation to Main Road.
PROV. LAB.
OFFICE OFFICE
LAB.
GAS
LAB.
OFF
CE $
ERBARKIM
AC. PLANT
RAMP
UP
ON
STUDIO ETC,
Ground floor plan.
GENERAL
OFFICE
EXEC
OFFICE
• FLAT
ROOF
First floor plan.
ROOM
DEVELOPING
ACCOUNTS
ARTISTS
PRINTING
CLEANERS STORE
STORE
THE HONG KONG & FAR EAST BUILDER
VOLUME 14, NUMBER 6
Page 50Page 51