LAV.
na
SECOND FLOOR PLAN
LOCKER ROOM
CORRIDOR
S C A
•
THIRD FLOOR PLAN
14
24FT.
|CHANGING
LOCKER
LABEL STORAGE ROOM
PACKING
AREA
ROOM
ROOM
CHANGING
田
ROOM
LAV.
AIR CONDITIONING
UNIT FOR 3RD FL
LAY.
BELF-CLOSING DOOR
LAY.
-CHIMNEY
SUBDIVIDING
MACHINE
AUTOCLAVE
КОСМ OVEH
COOLING
ROOM
BUBDIVIDING MACHINES
STERILE SUBDIVIDING AREA
HALL
VIEWING
WINDOWL
AIR LOCK
H
34FT
ר
EXHAUST HOOD OVER
LB.
INOCULATION
ROOM
part of the floor.
Here they discard must be kept isolated from the two gallons for the steam boiler plant. Ad- their outer clothing, undergo a "sur- floors beneath.
ditional de-ionized water tanks and gical scrub" and don sterilized cloth-
Other points of interest are the hot water tanks are to be located on ing (including bandannas for the wo- large boiler room on the ground floor the ground floor.
men). They then pass along another with a Babcock & Wilcox installation, The approximate cost of the build- corridor through "curtains'
'curtains" of ultra- the animals room on the same floor ing itself is about $1,000,000 but the violet light, proceed up the main stairs used to keep rabbits for the testing equipment to be installed is expected and through an irradiated air-lock in- of drug samples, and the laboratory to
run to about three times that to the sterile section on the top floor. and inoculation rooms in the rear of figure. The factory should be in pro-
This procedure requires that the the top floor where
where experimental duction by. main staircase leading up from the checking of products takes place. street to the first floor office section, The need for steam heating, de- should be sealed off above that level ionized water, hot and cold water, by a door which can only be opened and compressed air, requires a varied in emergency. This is because the arrangement of piping. The flat roof second floor front corridor and the also will carry tanks for a 10,000 gal- main stairs leading from the second lon supply for the subdividing plant, floor to the top floor are already in 1,400 gallons for flushing; 2,000 gal- the sterile zone of the premises and lons for the fire service; and 2,000
General Contractor: Winsome Co. "Crittall" Metal Windows: Dodwell
& Co., Ltd.
Lift: Jardine Engineering Corp.,
Ltd.
Air-Conditioning: Yee On Hong Co.,
Ltd.
Steam boilers: Babcock & Wilcox.
Ltd.
SCHINDLER LIFTS & ESCALATORS
Harmonious blending with the
building style combined with
all features demanded
by modern Lift engineering
For expert service, technical advice and
estimates consult.
JEC
THE JARDINE ENGINEERING CORPORATION, LTD.
Jardine House, 22 Pedder Street Telephone: 38081
56
CHIND
DLER
1874