LAV.

na

SECOND FLOOR PLAN

LOCKER ROOM

CORRIDOR

S C A

THIRD FLOOR PLAN

14

24FT.

|CHANGING

LOCKER

LABEL STORAGE ROOM

PACKING

AREA

ROOM

ROOM

CHANGING

ROOM

LAV.

AIR CONDITIONING

UNIT FOR 3RD FL

LAY.

BELF-CLOSING DOOR

LAY.

-CHIMNEY

SUBDIVIDING

MACHINE

AUTOCLAVE

КОСМ OVEH

COOLING

ROOM

BUBDIVIDING MACHINES

STERILE SUBDIVIDING AREA

HALL

VIEWING

WINDOWL

AIR LOCK

H

34FT

ר

EXHAUST HOOD OVER

LB.

INOCULATION

ROOM

part of the floor.

Here they discard must be kept isolated from the two gallons for the steam boiler plant. Ad- their outer clothing, undergo a "sur- floors beneath.

ditional de-ionized water tanks and gical scrub" and don sterilized cloth-

Other points of interest are the hot water tanks are to be located on ing (including bandannas for the wo- large boiler room on the ground floor the ground floor.

men). They then pass along another with a Babcock & Wilcox installation, The approximate cost of the build- corridor through "curtains'

'curtains" of ultra- the animals room on the same floor ing itself is about $1,000,000 but the violet light, proceed up the main stairs used to keep rabbits for the testing equipment to be installed is expected and through an irradiated air-lock in- of drug samples, and the laboratory to

run to about three times that to the sterile section on the top floor. and inoculation rooms in the rear of figure. The factory should be in pro-

This procedure requires that the the top floor where

where experimental duction by. main staircase leading up from the checking of products takes place. street to the first floor office section, The need for steam heating, de- should be sealed off above that level ionized water, hot and cold water, by a door which can only be opened and compressed air, requires a varied in emergency. This is because the arrangement of piping. The flat roof second floor front corridor and the also will carry tanks for a 10,000 gal- main stairs leading from the second lon supply for the subdividing plant, floor to the top floor are already in 1,400 gallons for flushing; 2,000 gal- the sterile zone of the premises and lons for the fire service; and 2,000

General Contractor: Winsome Co. "Crittall" Metal Windows: Dodwell

& Co., Ltd.

Lift: Jardine Engineering Corp.,

Ltd.

Air-Conditioning: Yee On Hong Co.,

Ltd.

Steam boilers: Babcock & Wilcox.

Ltd.

SCHINDLER LIFTS & ESCALATORS

Harmonious blending with the

building style combined with

all features demanded

by modern Lift engineering

For expert service, technical advice and

estimates consult.

JEC

THE JARDINE ENGINEERING CORPORATION, LTD.

Jardine House, 22 Pedder Street Telephone: 38081

56

CHIND

DLER

1874

CHIMNEY

Share This Page