A further feature is provided by the mosaic tile murals with which the two walls flanking the driveways on the ground floor are decorated.
Two details of the front elevation.
Co.
The architect has included covered 6-passenger lifts, Simplex down col- parking facilities for all the tenants as lective control for operation with at- part of the ground floor of the build- tendant, with automatic floor levelling. ing, with parking spaces for visitors' General Contractors: Hsin Chong & cars on the terrace immediately sur rounding it.
"'Schindler" Lifts: The Jardine The plans of the apartment units Engineering Corp., Ltd. have been published in a previous Electrical Installation: number, and fully describe the accom- Engineers, Ltd. modation. The approximate area of each apartment is 1,500 square feet. and waste space has been reduced to an absolute minimum.
Colour has also been extensively used on all interior walls, particularly The Jardine Engineering Corp.,
Ltd. have installed two "Schindler
in halls and passages.
The China
Coloured Glass R. Corney & Co., Ltd. "Armstrong" Asphalt Floor Tiles: Times & Company.
Sanitary Fixtures: Kitson & Co., Ltd. Metal Windows, Mullions & Transoms: Canton Metal Window Mfg. Co.
SCHINDLER ESCALATOR
SCHILLER ESCALATOR
Loading at Factory En Route for Installing in
MANSON HOUSE Nathan Road, Kowloon, Hong Kong.
CAPACITY:
5000 6000 persons hour
RISE (Vertical):
14'- 6” & 11'-6′′
VOLUME OF CASE:
63m3 2225 cu. ft.
SIZE OF CASE:
12m long x 1.6m wide x 3.3m high (39.3 ft. x 5'. 3''
x 10' - 10")
WEIGHT:
12 tons.
JEC
JARDINE ENGINEERING CORPORATION, LTD.
14-16, Pedder Street
Telephone: 38081
40