·STAFF RMA

1ST & 2ND FLOOR PLAN

20

Detail of the entrance.

The total cost of construction was $139,038.10: this includes the black- boards, tackboards, teakwood cup- boards and built-in desks for the teachers. The new building was

crete framed construction with brick stair halls and in the corridors, as panel walls, except for the northern well as the staircase itself, are paved tower which has exposed random with coloured mosaic tiles: glazed coursed rubble panel walls. The tile dadoes are provided along the corridors are cantilevered out from walls in these parts. The class-rooms building contractors the building itself. The floors in the have cement tile floors.

designed by Mr. W. Szeto, B.Sc., who is an old boy of St. Paul's; the were Messrs. Shui Tai & Co.

HERE ARE A FEW REASONS FOR USING

PAUL'S MANSIONS, KOWLOON

ARCHITECTS: PALMER & TURNER

Pe Glass Blocko can be installed at once.

No waiting for hard-to-get materials.

PC Glass Blocks

in all types of buildings

They are smart, modern in appearance Cut off unwanted views - afford

privacy

Reduce heat loss in winter, admit less heat in summer

★Prevent infiltration of dust and grit ★Deaden outside noises

Cut repairs and maintenance cost Reduce condensation on light- transmitting areas

Can easily be kept sparkling clean

Stocks available from the Sole Agents:

GETZ BROS. & CO. GETZ

416, Edinburgh House

Building Supplies Dept.

-

44

Tel. 22505 & 23533

Share This Page