the dark green marble facing to the entrance foyer. The ceilings in all verandahs have been left unplastered straight from plywood shuttering.
Considerable care was taken in the colour scheme and full use has been made of the new Super Snowcem colour range to give an attractive and gay colour effect throughout, phasised by the picking-out of door and trimmings in bright primary colours differing on each floor.
em-
The buildings are equipped with large electric clocks inside at all points and operated through a master clock. For security there has also been installed a very complete system of watchmen's clocks and alarm bells.
Externally the large number of students and teaching staff to be catered for is reflected in the consider- able areas of concrete-paved parking areas and the wide internal ring road around the whole boundary of the site. Considerable planting of flower- ing shrubs and trees has been carried out under the building scheme, care being taken that trees are well clear of the areas on which future exten- sions have been planned. These future extensions will
will include the auditorium, canteen, common rooms and gymnasium as well as extensive additional wings to the workshop and classroom and laboratory block. cidentally, the entrance block, which is at present four storeys, has been designed to be brought up later to the general height of six storeys.
In-
The whole of the fitted and loose furniture has been designed by the architects and carried out by local firms. The bulk of the loose furniture
desks, chairs and stools has been designed to "nest" to facilitate storage. The total cost of the furni ture was approximately M.$300,000.
The architects were Messrs. Swan & Maclaren who also carried out all the structural engineering design.
The main contractor for the work- shop block was Nanyang Structural Co. Ltd. and for the main College buildings the main contractor Loke Hong Kee.
44
was
Site investigation: Malayan Drillers
Ltd.
Site clearance;
for workshop block: Gammon (Malaya) Ltd.
structural steelwork
Rear block (laboratory and classrooms).
Piled foundations: United Engineers
Ltd.
Supply & delivery of high tensile
steel: Union Construction (Shang- hai) Co.
General building work for workshop block: Nanyang Structural Co. Ltd. Sanitary installation & water supply for workshop block; sanitary & gas installations & water supply to blocks 'B' & 'C': Tong Nam Contractors Ltd.
Wiring & electrical installation to Alliance En- workshop block: gineering Co. Ltd.
Gas installation: Watts & Baker
Ltd.
Ironmongery; plastic finger plates
for doors: Borneo Co. Ltd. Metal windows; strong room door; plastic finger plates for doors: William Jacks & Co. (M) Ltd. Aluminium canopies : Diethelm &
Co. Ltd.
Aluminium purlins: Harper, Gilfil-
lan & Co. Ltd. General building work blocks 'B'
& 'C': Loke Hong Kee. Roofing to blocks 'B' & 'C': Tong
Nam Roofing Specialists Ltd. Metal windows to blocks 'B' & C':
Guthrie & Co. Ltd.
Wiring & electrical installation to blocks 'B' & 'C'; lift installations to blocks 'B' & 'C': Harrisons, Lister Engineering Ltd. Air-conditioning to blocks 'B' & 'C': Climate Engineering Ltd. External lighting: General Electric
Co. (M) Ltd. Fire-fighting equipment;
Warren & Co. Ltd.
James
Bronze lettering & ornamental lan
terns to main entrance: Alliance Plastics.
Telephone conduits: Reliance Elec-
tric.
Plastic letters: Far East Plastic
Fabricators.
Steel lockers: Roneo Ltd.
Furniture & Effects:
Ng Ming, Hup Cheong Co., Henry & Co., William Jacks & Co. (M.) Ltd., Hwa Seng Furniture, Art Furniture Depot Ltd., Tong Brothers, Teck Chiang Manufactory Ltd., Yong Furnishing & Contractor, Yat Seng Furniture, Contractor, Keng Hua Van Hin Furniture Co. Ltd., Comfort Furniture Co., Hong Sung Furniture Co., Duncan Roberts Ltd., Nam Yew & Co., Alexander Young (London) Ltd., Diethelm & Co. Ltd., John Little (Malaya) Ltd., Paterson, Simons & Co. Ltd., James Miller & Co. Ltd.