MANDARIN HOTEL

ments at the junction of the columns and floors. all beams were omitted and a flat slab construction was adopted for the lower floors also. thus greatly facilitating the planning of air conditioning ducts and other horizontal services.

Estimated cost of the piling and reinforced concrete superstructure is in the neighbourhood of $11.000.- 000 exclusive of finishing costs. The completed hotel is estimated to cost when completed approximately $80.000.000.

Sub-contractors and suppliers in-

clude:

ALUMINIUM & METAL WIN DOWS: Dodwell & Co. Ltd. (Crittall) AEROFOIL & PROPELLER FANS: British General Electric Co. Ltd.

PORCELAIN WALL TILES: Sino-British (H.K.) Ltd. (L.S.)

HEATING & HOT WATER SER- VIC: Jardine Engineering Corp. Ltd.

PAINTS: I.C.I. (China) Ltd. (Pentalite)

Duro Paint Mfg. Co. Ltd. (Armourkote Textured Wall Finish. Duroseal Water Repellent, Duro Synthetic Enamel).

STAFF LOCATION SYSTEMS: Jardine Engineering Corp. Ltd. (Multitone).

MOVABLE STORAGE

SYSTEM

& STEEL LOCKERS: Shewan, Tomes (Equipment) Ltd. (Brown- built Compactus).

LIGHTING FITTINGS:

British

General Electric Co. Ltd. (Rotoflex) Jardine

Engineering Corp Ltd.

(Atlas), Rich and Co.

Inniss

PLUMBING FIXTURES: & Riddle (China) Ltd. (American Standard).

ALUMINIUM SCREEN, MIRROR & PARTITION FRAMES: Petman Ltd.

INTERNAL TELEPHONE SYS TEM: Jardine Engineering Corp. Ltd. (A.T.T. & E.P.A.B.X.) installed by Hongkong Telephone Co. Ltd.

ACOUSTIC TILES: Vai Cheong Co. (Armstrong Travertone).

MARBLE: Raoul Bigazzi.

LOCKS & DOOR HARDWARE: Shewan, Tomes (Equipment) Ltd. (Schlage. Rowley, Tonks & Lanceri, KITCHEN EQUIPMENT: Davie. Boag & Co. Ltd.

PLASTIC HANDRAILS: Cheong Co. (Mipolam).

Vai

FLOOR HARDENER : E-Line King (Stonhard Concretetite).

China Engineers

LIFTS: The China Ltd. (Mitsubishi).

AIR-CONDITIONING: American Engineering Corp.

COOKING EQUIPMENT: Hong Kong & China Gas Co. Ltd.

TAI WO HAU ESTATE

NOTHER 13 resettlement blocks are to be built at the Tai Wo Hau Resettlement Estate. They will provide accommodation for about 16.000 people.

The blocks will be of the new type. The eight-storey buildings will have a corridor running through the middle of each block. There will be rooms opening on both sides of the corridor with each room having its own balcony.

THE HONGKONG & CHINA GAS CO., LTD.

GLOUCESTER BUILDING, 2ND FLOOR.

TELEPHONE: 35311

P. O. BOX 134, HONG KONG.

FOR:

FASTER

CLEANER

• FLEXIBLE

FOR:

• INSTANTANEOUS

• ENDLESS FLOW

• EASILY REGULATED

• FLAME

COOKING

GAS

• STEAMING

HOT WATER

TOWN'S GAS OR 'BUTAGAS'

SHOWROOMS

GLOUCESTER BUILDING. EAST ARCADE

252, NATHAN ROAD, (CORNER OF JORDAN ROAD).

GAS CENTRE, DAIMARU STORE

-

TEL. 28394

TEL. 63059

TEL. 773816 EXT. 20.

THE HONG KONG & FAR EAST BUILDER-VOLUME 18, NUMBER 2

89

Page 95Page 96

Share This Page