Particulars

Installation of a floood-lighting system for the Tennis Exhibition

Court at Victoria Park, Hong Kong

Supply and laying of asphalt roofing at Tang Lung Chau Market.

Hong Kong

Supply of thinners for shellac

Supply of concrete cable tiles

Supply of aluminium sheets

Supply of brass and phosphor bronze rods

Supply of brass and phosphor bronze rods Supply of Sloan "Naval" flush valves

Supply of brass and phosphor bronze rods

Supply of Portland cement

Supply of “Onoda" cement

Supply of aluminium sheet

Supply of Portland cement

Contractors

Yeu Sang Hong Ltd.

Amount

26,429

Frecast Products Ltd.

11,501

Allied Concrete Products

National Lacquer & Paint Products Co., Ltd.

12,500

13.909

South China Building Materials Ltd.

18.000

7,934

Alcan (Asia) Ltd.

c.i.f. H.K.

Mutsubishi Shoji Kaisha Ltd.

894

c.l.f. H.K.

Sumitomo Shoji Kaisha Ltd. Hang Lee Co.

3,990

7,576 delivered

14,869

Innis & Riddle (China) Ltd.

Green Island Cement Co., Ltd. Sumitomo Shoji Kaisha Ltd.

Alcan Asia) Ltd.

Green Island Cement Co., Ltd.

Sumitomo Shoj: Kaisha Ltd.

c.i.f. H.K.

49,000

37.797 c.i.f. H.K.

6,496

c.i f. H.K. 49,000 c.i.f. H.K.

Supply of "Onoda" cement

JUNE 1962

:

:

:

Construction of bus station and road realignment of Pok Fu Lam

Road to City Boundary

Construction of latrine and bathhouse at Tung Tau Tsuen Road Construction of latrine and bathhouse at Peng Chau

Reconstruction of Ma Tau Chung Road (from Sung Wong Toi Road

to Kowloon City Roundabout)

Construction of Kwun Tong Road, Stage I (Hammer Hill Road to

Kwung Tong Road, Stage II)

Removal of over-burden from Hok Yuen Quarry from July, 1962

to March, 1963

Reconstruction of Cheung Sha Wan Road (Yen Chau Street/Tai Po

Road)

Improvements to Stanley Village Road/Stanley Gap Road junction Construction of storm-water culverts at the south of Tin Hau

Temple Road Construction of inside harbour services ferry pier and seawall at

Central Reclamation. Stage IV

Construction of part of Tsun Yip Street, Kwun Tong Construction of storm-water drains and intercepting

Kwun Tong Road, Stage I

Construction of Kai Tak Airport Maintenance Area, Stage II Construction of blast deflection screen at Kai Tak Airport Supply and laving of wood block flooring at Gascoigne Road Gov-

ernment Quarters

Site of formation at Waterloo Road Hill, Stage II

Construction of reads and drains (Stage II) at Kwai Chung Area 27 Supply and laying cf mastic asphalt roofing to Resettlement Estate

at Wang Tau Hcm. Stage I (Part 2)

Supply of International Harvester Tractor Supply of louvre frames

Kwan On

Henry Engineering & Construction Co. Henry Engineering & Construction Co.

Union Construction Co.

Davie. Boag & Co., Ltd.

18,898 c.i.f. H.K.

$ 237,449

130,170

127,487

189,981

Winsome Co. (Engineers & Builders) Ltd.

Winley Construction Co.

1,139,386

200,0001

Tak Hing Contractors Ltd.

555,285

Cheung Sun Kee Construction Co.

189,181

Union Construction Co.

263,980

Fung Kau Kee Contractors Union Construction Co.

1,863,231

82.382

sewers in

Union Construction Co.

519,439

Winsome Co. (Engineers and Builders) Ltd. Shing Fat

980,913

21,550

On Lee & Co.

73,776

Winsome Co. (Engineers & Builders) Ltd Wing Lee Construction Co.

1,103.669

989,079

Precast Products Ltd.

101,643

Blair & Co., Ltd.

59,500

166.176

1,300

12,140

Manufacturing

Co.

11.176

9.498

24.457

Hong

Kong Metal Window Manufacturing Co.. Ltd.

8,400

Shanghai Well Boring & Engineering Co.

6.500

Messrs. Wing Wah Co.

27.500

Sino-British (Hong Kong) Ltd.

5.424

32,000

7,300

Metal Window Manufacturing

Co..

9,057

Davie, Boag & Co., Ltd. Innis & Riddle (China) Ltd. Alcan Asia Ltd.

17,142

21.869

I

14.858

ex. godown

Hong Kong Aluminium Ltd.

1.110,000 delivered

* Estimated value.

Demolition of existing buildings of Hennessy Road Government

Primary School, Hong Kong

Supply and laying of asphalt roofing and insulating tiles for Dis-

trict Branch Office at Kwun Tong

Supply of metal windows and doors for E. & M. Workshops. To

Kwa Wan Road, Kowloon

Supply and laying of mastic asphalt roofing to Wong Tai Sin Re-

settlement Staff Quarters Kowloon

Supply of adjustable metal louvre windows and operating gear for

E. & M. Workshops at To Kwa Wan Road. Kowloon Supply and installation of a lantern light for Tang Lung Chau

Market at Jardine's Corner, Hong Kong

Sinking of a borehole well for Ho Tung Techical School for Girls-

Extension

Construction of two "Entout-cas" tennis courts at Castle Peak

Hospital

Supply and laying vitreous mosaic tiling at Tai Wo Hau Resettle-

ment Staff Quarters

Piling to foundations for additions to Central Fire Brigade Building.

Hong Kong

Installation of electric dumb-waiter at the Junior Ranks Club

Victoria Barracks Reconstruction. Phase IIA

Supply of metal windows with fly screens and metal doors for

Tai Wo Hau Resettlement Staff Quarters

Supply and laying of mosaic tiling to bandstand and shelter of

Victoria Park, Hong Kong

Supply of V.I.R. cables

Supply of aluminium sheet and matting

Supply of aluminium sheet and matting

Kwong Wing Building Contractor

Reiss, Bradley and Co., Ltd.

Canton

Ltd.

Metal Window

Precast Products Ltd.

Precast Products Ltd.

Kee Yip Construction Co., Ltd.

British General Electric Co., Ltd.

Canton

Ltd.

94

THE HONG KONG & FAR EAST BUILDER-VOLUME 17, NUMBER 2

Share This Page