The building will stand on a site of 15,545 square feet bounded by Des Voeux Road Central, Connaught Road Central, Queen Victoria Street, and David House.
The Bank will occupy the first second and third floors and will have also a penthouse. Total cost of the structure and land will be approx. imately $22 million.
The piling and foundation work, on which good progress is being made, is being carried out by the Vibro Piling Co. Ltd.
The frame of the building will be entirely of welded steel supplied by Dorman Long (B & E) Ltd.
In keeping with the planners' emphasis on service there will be a postal box on the ground floor, and conveniently placed on each floor a Lamson letter chute to the box.
Otis Autotronic lifts will be in- stalled. With a maximum speed of 700 ft. per minute they will cater for rush, off-peak, and light traffic automatically as conditions require.
The whole building will be air- conditioned, with plant located in the basement.
It is expected that work on the foundations will be completed by November next, and that the Bank will have been erected by June 1962.
Professor Sean Mackey. Professor of Engineering at the University of Hong Kong, is consulting engineer.
When the new headquarters have been opened the present headquar- ters in Queen's Road Central will be used as a branch.
The Bank already has a Kowloon Branch and proposes to erect a second branch there.
(Additional plans on next page).
ROAD
CENTRAL
CONNAUGHT
POWER
UP
LUP
LAVATORY
YARD
LAVATORY
STORE
SHOP
L
IF T
PI T S
AM.
PASSAGE
PATROL
PASSAGE
AIR - CONDITIONING PLANT
DN
SHOP
RAMP
SWITCH RM. UP
ARCADE
SHOP
NO
DN
OPEN
RCADE
VAULT
CSAFE DEPOSIT>
CUSTODIAN,
VESTIBULE
LOBBY
UP-
AREA
TIFFI
LAVATORY
SHOP
LOT BOUNDARY
EXEDUCT ZZZGAIR-CONDITIONING DUCTS
HIT
QUEEN
VICTORIA
STREET
LOT
SHOP
ARCADE
ESCALATORS
ENTRANCE
MALL
BOUNDARY
Top, plan of the basement which will house the vault, air-conditioning plant, and power room. Above. ground floor plan showing disposition of shops and arcades. Below, an impression of the main stairway giving access to the banking hall which will be located on the first floor. Escalators will serve