ROAD

R O A →

11

CONCRETE HARD STANDDE

Site plan of Engineering Faculty.

CONCRETE

T + T

HARD STANDING

T T

zoology and botany in the rear block. own entrances and the main services

One of the main features of this road runs building is that, though treated as one has been group, all the departments have their extension,

under each block. This done so that with future each building can be

extended east or west without inter- ference to the road access. The estimated cost of the buildings is $2,000,000.

The faculty of agriculture at the moment is at the design stage but it is hoped to have the buildings ready by March 1960.

Earth work for the lake in the centre of the valley is well advanced in the marshy ground, and on the ground to the east various playing areas are being laid out. It is hoped that funds will be available early in

the second phase to provide extensive sport pavilions, changing rooms and a grandstand for the athletics field. The total cost of the first phase of the University is in the region of $15.5 million.

First and second

second residential col- leges, arts building, library building, science faculty, University roads and services, architects-Palmer & Turner. Faculties of agriculture and en- gineering, architects P.W.D. Lake formation & playing fields:

Steen Sehested & Partners.

Harris paint brushes

Guarantee

If this Brush is found faulty it will be replaced, free of charge,

by your retailer or the makers. Postage will be refunded.

Bela Agentes

GORDON, WOODROFFE & CO. (FAR EAST) LTD.

318/322. EDINBURGH HOUSE, H.K.

TEL 31224

Harris

THE HONG KONG & FAR EAST BUILDER

VOLUME 14, NUMBER 2

Share This Page