to complete. However, good progress was possible there- after, owing to the fact that roof was reached just before the rains set in June and July. The whole operation took only 10 months to complete, that is from November 1948
to September 1949.
Many novel methods and materials were used in the building with success, the most outstanding of which
were:
(1)
(2)
(3) (4)
Coloured asphalt floor tiles to match colour of walls,
Crittall Pressed steel doors of single and double leaves,
Hyspecon walling method for partitioning, Sprayed-on waterproof distemper both inside and
out.
In view of the high cost of red bricks just now, the Hyspecon walling method would probably provide special interest, as the cost of partitioning was reduced to only about 1/3 that of ordinary brick partitioning. The University test results on the mixture show the following figures:
Material: 1 cement and 4 latirite.
Density of block: 130 lbs. cu.ft. Crushing stress (lbs. sq. inch)
7 days
4 weeks
437
1176
315
1121
A close-up view of the building.
32,000 sq. ft. floor area on six main and identifical floors with a mezzanine and entrance at the Lower Albert Road.
The building is served by a Schindler standard hospital bed lift and a press-buttoned food lift. There are fire- escape ladders one for each wing. Owing to the presence of A.R.P. tunnels right underneath the building, the founda- tions were unusually heavy, and alone took three months
Architect: Kuo Yuan-hsi
General Contractor: The Eastern Building Contruc- tion Co.
Lifts: The Jardine Engineering Corporation Ltd. Plumbing: Dodwell & Co., Ltd.
Wiring: British General Electric Co., Ltd.
Terrazzo Works: Hongkong Marble Works,
Doors & Windows: Crittall-Dodwell & Co., Ltd.
BUILDING SUPPLIES
"TURNALL" "CRANE"
"YORKSHIRE” "CEMENTONE"
"PUDLO"
"HEATRAE” "EXPAMET"
"A.I."
"FOAMITE"
"NEWALLS” "OZONO"
"FALCO"
STOCKS AVAILABLE
"ELECTROMATIC" "RELIANCE” "PHILPLUG" "LEE HOWL" "HURSEAL" "RUBBERLOCK" "CRITTALL" "CHATWOOD"
Asbestos Cement Products.
Boilers, Domestic.
Copper Tubes & Fittings.
Cement Colouring Powder.
Cement Waterproofing Powder.
Electric Water Heaters.
Expanded Metal.
Fire Places.
Fire Fighting Equipment.
Insulation: Heat, Cold & Sound. Ozone Generators.
Oil Cooking Ranges.
Oil Burners, Fully Automatic. Oil Burners, Range.
Plugging Materials.
Pumping Equipment.
Radiators, Oil Loaded Electric.
Rubber Flooring Tiles.
Windows & Doors, Metal. Vault Doors & Safes.
DODWELL & CO., LTD.
MACHINERY & CONTRACTING DEPT.
Hong Kong & Shanghai Bank Building.
Hong Kong
Telephone 28021.
54
Δ