celbuildings

the boon to progressive industry

CALTEX Lubricating Oil Blending Plant at Tanjong Penjuru, Pasir Panjang Singapore

Single Span-70 ft., Length 300 ft., Aluminiunt Roofing, Centre Portion Double - Storied. MADE TO·

REQUIREMENTS OF CALTEX

Largest STEEL-FRAMED building in Malaysia Picture shows frames for BRIDGESTONE MALAYSIA CO., LTD. going up at Jurong.Singapore When completed the structure will have a total length of 1246ft. with a span of 132 ft.

Typical factory-cum- office building

celbuildings itd

A few of the many projects

for better STEEL FRAMED buildings

Consult celbuildings

29. TANGLIN HALT CLOSE, SINGAPORE. 3. TEL:61717

limited

SPECIALISTS IN THE CONSTRUCTION OF STEEL-FRAMED BUILDINGS INCLUDING OFFICES, WAREHOUSES. AIRCRAFT HANGARS ETC.

THE HONG KONG & FAR EAST BUILDER-VOLUME 19. NUMBER 1

41

Share This Page