LAYOUT PLAN

RESERVOIR

feet and a 2,000 ft. pipe line from the sea for flushing.

Because of its length and the height to which it had to be carried. the pipeline cost $150.000.

Taking into account the expense of the pipeline, the inclusion of fit- tings in the budget and the novel, multi-storey street construction, the cost per cubic foot. at an expected $1.75, will be low.

The site area (A.I.L. 260) was formerly terraced paddy fields. It has an area of 160 thousand square feet.

The building area. when complet- ed, will total about 60.800 square feet. The buildings, like the paddy fields. will be on terraced levels.

More than 800,000 cubic feet of excavation had to be carried out during site reformation.

TAPS AND SINKS: Deacon and Co. Ltd. (Twyfords. Peglers). ELECTRICAL WIRING

INSTALLATION:

Engineering Corp. Ltd.

Jardine

PUBLIC

arou

BLOCK

B

ABERDEE

BLOCK

C

BLOCK A

BLOCK D

Opal

BLOCK E

PAINT: Duro Paint Manufactur. ing Co. Ltd. (Durocrete water- proof cement paint.

primers and Opal synthetic enamels and undercoats.)

PLUMBING INSTALLATION;

Lee Yu Kee Ltd.

BOREHOLE WELLS. PUMPS. PIPELINES: Dreyer and Co. Ltd. (Lithurin. Nolco.

Nolco. Emu. Eternit.)

PUBLIC

ROAD

LAUNDRY RACK

PERSONS

CANOPY

BAL TAL

UP ON

OPEN

SPACE

RAILING

C

1⁄2 PERSONS

13 PERSONS

LAUNDRY RACK

R

N

C

A L

24

32

40 40 FT

THE

THE HONG KONG & FAR EAST BUILDER - VOLUME 18. NUMBER 1

TYPICAL

FLOOR

PLAN

TT

TI

ROAD

11

93

94

Share This Page