General Contractor-Fook Construction Co.

Kee

Schindler passenger lift: Jardine Engineering Corp. Ltd.

Marley tiles: Dreyer & Co. Ltd. Metal Windows-Canton Metal Win- dows Co. Ltd.

Aluminium Fold Door-Shewan Tomes & Co. Ltd.

BRITISH SCHOOL DESIGN FÖR EXHIBITION - Half a million visitors expected at this year's Twelfth Triennale in Milan will see an example of a modern British prefabricated school which combines high quality with low price.

Theme of the exhibition which opens on July 16 is "The Home and the School" and Britain's achieve- ment in the field of school architec- ture has led the Government to send a national exhibit to the Triennale for the first time.

The building has been designed by a team of four under the Notting- ham County Architect, Mr. W.D. Lacey. It is a typical three-class primary school designed under the consortium of British local authori- ties' special programme.

TTTTTT

Since the war British school ar- chitects have not only altered the shape and physical surroundings of education but halved building costs as well, at the same time providing much more accommodation.

The consortium has been a means of lowering costs still further. Several authorities are co-operating to take advantage of bulk-buying and large-scale production.

The school going to Milan has a central assembly hall which rises over surrounding classrooms and the staff room.

Courtyards separating the rooms are an important part of the plan. The prefabricated steel frame can be erected in five days.

Building time in Milan will be nine and a half weeks against the usual time of 14 weeks.

Although the school will contain examples of school work the idea of filling it with English school children was dropped because of the expense.

When the Triennale closes in November the school will be moved to a Milan housing estate as a gift to the Italian Government.

TEACHERS

|

CHALK

BOARD

DN

BOYS

GIRLS

KA

WAI

CLASS ROOM

TEACHERS

LIFT

DN

BOARD

CHALK

CLASS

MAN

ENTRANCE

ROAD

UPPER

PORTION

ENTRANCE

OTPATH

TTTTI

EX, SLOPE TO BE TURFED

RAILING

LIGHT WELL

LIGHT WELL!

ROOM

CHALK

BOARD

RR I D

CLASS ROOM

Above, third floor plan. Below, sixth floor plan.

ORGAN OVER

ORGAN I

OVER

PRIESTS VESTRY

SKYLIGHT OVER

SANCTUARY

VESTRY

CHANCEL

SCHOOL

CHALK

BOARD

CLASS

ROOM

CLASS ROOM

NO

CHALK

BOARD

CHALK

ORGAN

ASSEMBLY

ON

CLASS ROOM

HALL

-

GALLERY

DN

GALLERY OVER

34

Share This Page