PARTICULARS

Electrical installations at Castle Peak Hospital, Stage II Asphalt roofing of Cheung Sha Wan Police Quarters Installation of a cold store, Chi Ma Wan Prison, Lantau Supply of metal windows and doors for Cheung Sha Wan

Police Quarters

Electrical installation at Cheung Sha Wan Police Quarters Central Government Offices, Electrical installations for air

conditioning plant

North Kowloon Magistrary Building steel windows Shek Pik Scheme additional electrical wiring

Site investigation, Shek Pik Scheme, Lantau

Access roads, water supply and fencing for bungalows at

Cheung Sha, Lantau

+

Providing and fixing of boundary stones, etc. in the Colony Shak Kok Mei River Bank works

Construction of river banks at Sheung Tsuen

Construction of Tai Shui Nai Bridge

+

Construction of Um Cemetery Road at Cheung Chau Construction of football field at Shuen Wan

Training of river and construction of embankment at Lin Ma

Hang

+

-

Construction of dam and storage tanks, and laying water

piping at Lung Mei

Construction of bridge at Hok Tau Village

Construction of footpath and other works at Wun Yui Repairs to river banks at Kwai Chung Construction of car park at Pak Sha Wan

March 1959

Housing Scheme at So Uk, Cheung Sha Wan, Lift installations

in Blocks T and U

Construction of Lamma Island Agricultural Station Construction of two blocks of resettlement housing at

Cheng Uk (Phase IV)

CONTRACTORS

The British General Electric Co. Ltd. Dreyer & Co., Ltd. American Engineering Corporation

China Steel Works Ltd. China Engineers Ltd.

Winsome Co.

Dodwell & Co. Ltd.

The China Engineers Ltd. Gammon (Hong Kong) Ltd.

Ching Hing Construction Co. Ltd. Winley Construction Co.

Union Construction Co.

Union Construction Co. Fook Cheung Yuen Sau Kee Ngai Foon

Cheung Sek Shou

Wah Nam Construction Co. Lee Hong...

Union Construction Co.

Union Construction Co. Union Construction Co.

:

AMOUNT

504,241.00 61,637.82

20,420.00

170,044.10 364,000.00

154,100.00

80,886.00

145,000.00

10,000.00*

80,000.00*

34,000.00*

31.745.80

18,772.50

13,429.20

23,027.50

5,200.00

17,520.00

15.397.00

8,620.00

12,578.50

33.355.20

7.844.00

The British Genedal Electric Co. Ltd. Wing Yip Construction Co.

194,440.00 32,735.90

Li

Cheong Lee Construction Co.

938,528.03

+

Cheong Lee Construction Co. Lam Construction Co.

Construction of four blocks of resettlement housing at Lo

Fu Ngam, Stage II ...

Alterations and extensions to King's College

Construction of resettlement housing and factory block at

Jordan Valley

Site formation of Section B. Housing Zone III, at Kwun

Tong New Town

Construction of road to Lo Fu Ngam from Junction Road Construction of a Post Office at Sheung Shui

Maintenance work in Resettlement Areas and Estates from

1.4.59 to 31.3.60

Construction of Jordan Valley dam

Removal of overburden from Mt. Butler Quarry from April

to September, 1959.

Construction of Aberdeen Service Reservoir (West Half) Construction of a grandstand at Southern Playground Maintenance of way and structures, Kowloon Canton Railway,

from 1.4.59 to 31.3.60

HI

--

Construction of Wong Tai Sin salt water service reservoir Construction of Ma Lau Tong dam

Electrical installations at Kwun Tong Resettlement Estate,

Blocks A, B, C & D

Provision of electrical services at Cheung Sha Wan Police

Quarters

Supply of metal windows and doors for Buxey Lodge Electrical installations in Tai Lam Chung catchwater tunnels Supply of metal windows and doors lifts at Cheung Sha Wan

Police Quarters Kowloon

Electrical installations at Lo Fu Ngam Resettlement Estate

Blocks J, K, L & M

Electrical installations at Li Cheng Uk Resettlement Estate Kowloon Magistracy air-conditioning

Supply and installation of two electric lifts at Buxey Lodge Piling for foundations of City Hall

Electical installations at Queen Elizabeth Hospital Sisters'

& Nurses' Quarters

Electrical installations at Sheung Shui Post Office

Emergency shoring works to dangerous buildings for the period

1.4.59 to 31.3.60

Supply of second-hand steel sheet piles for Shek Pik pier

* Estimated Value

THE HONG KONG & FAR EAST BUILDER VOLUME 14, NUMBER 1

Cheong Lee Construction Co.

Wan Hin & Co. Ltd. Nam Hing Co. Yee Lee & Co.

Hung Yue & Co.

Paul Y. Construction Co.

Fook Lee & Co. Nam Hing Co. Hop Cheong & Co.

Lee Yuen Construction Co. Wan Hin & Co. Ltd. Lam Construction Co.

:

Jardine Engineering Corporation Ltd.

China Light & Power Co. Ltd.

Hong Kong Metal Window Mfg. Co. Ltd China Light & Power Co., Ltd.

The China Engineers Ltd.

Tung Yuen Hong

Wing Woo Electrical Co. Yee On Hong Co. Ltd. Otis Elevator Co.

Hong Kong Engineering & Const. Co. Ltd.

Tung Yuen Hong

The British General Electric Co. Ltd.

Fook Lee & Co. George Wimpey & Co. Ltd.

† Payable to Government

1,143.505.05 471,210.17

5,134,206.68

060,000.00

123,110.00

156,587.16

600,000.00* 1,543,067.00

100,000.00* 564,986.00

115,432-75

100,000.00*

1,116,718.50

1,175,460.00

29,595.00

15,000.00 77.348.86 12,000.00

288,000.00

12,600.00

II,599.95

23,580.00

193,000.00

948,560.00

225,450.00

8,444.00

60,000.00* 38,856.76*

69

Share This Page