30

NATHAN

ROAD

PAVEMENT

SCAVENGING

LANE

SHOP

SLAVICE

LIFT LOBST

D

ARCADE

COFFEE EKOP

LIFT LOBEY

LOUNGE

PAVEMENT

MIDDLE ROAD

[

TARD

ROOM

GENTS

LADIEB

LERVICE

BACALATOR

JOTOUT

(Left) Ground floor plan. (Centre) First floor plan. (Right) Typical hotel floor plan.

C

A

H

N

ARCADE

GENT

FLAT ROOF

ARCADI

·

0

+

“FICALATORU

لماط

M LIVING ROOM

FPT DUCT

M

CORRIDOR

LA

CORRIDOR

по

1 A

13

Completion is expected about the An escalator will run between the the top floor.

middle of 1960, and when opened ground floor and the first floor, which The hotel will be of reinforced con- this hotel will make available over will be occupied entirely by a shop- crete frame construction and will have 300 rooms.

ping arcade.

central air-conditioning and hot water supplies.

The new building will be eighteen The fourteen floors from the second stories high plus a basement, in which to the fifteenth will contain the guest will be service rooms, such as a boiler bedrooms and suites. room, the air-conditioning plant, On the sixteenth floor will be the furniture store, etc.

The ground floor accommodation will include a large lounge, a coffee shop, and an arcade with four shops,

hotel dining room, a lounge, a night club and the necessary service facilities for these amenities. Manager's quar- ters and a staff dormitory will be on

General Contractor: South Sea

Construction Co.

Piling: Kee Yip Construction Co. Elevators: Mitsubishi Shoji Kaisha,

Ltd.

Escalator: Otis Elevator Co.

COMMER

IS THE ONLY 12 TON VAN WITH

All-steel body,

over 300 cu.ft. Capacity

Maximum fuel economy

Choice of petrol or diesel engine

COMMER-built stronger to last longer! GILMAN MOTORS

CITY SHOWROOMS - PEDDER ST. H.K. TELS. 36805, 34181

KOWLOON SHOWROOMS — CHATHAM RD. TELS. 65454, 63108

THE HONG KONG & FAR EAST BUILDER VOLUME 14, NUMBER 1

Share This Page