16

24

32 FT.

S C

A

L

E

CLASS ROO

-2510-

CLASS ROOMS

BOYS LAV.

GALLERY

2240

AM.

CHANGING

O R R

R

CLASS ROOMS

7327/2

ON

-64467

7TH FLOOR PLAN

TEACHER

Arrangement of the class rooms on the seventh floor, which is the largest dimension

of the building.

The overall height of the building will be 165 feet from Glenealy to the roof of the main portion of the structure 77 feet above Robinson Road. The total floor area, ex- cluding playgrounds, will be 43,535 sq. ft. with thirty classrooms, 2,530 sq. ft. of laboratories. 1,000 sq. ft. of special teach- ing rooms and 1,200 sq. ft. for the library with 3,040 sq. ft. of floor area for teachers room and administration offices. The covered playground areas will be 4,295 sq. ft.

All this will be included in the total cubage of the building of over 630,000 cu. ft.

The estimated cost of construction will be over $800,000 which includes the cost of $50,000 for the two goods lifts. The cost per classroom works out to just over $28,000 or just under $600 per pupil.

The second and third floors, which will be slightly larger as the building follows the slope of the hill, will each have in addition to two classrooms and a teachers' room, additional space for a teachers room or a large store room.

At the fourth floor level, the area is still larger and will contain another covered playground with room for a games store and a large changing room. The fifth floor will have space for three classrooms, tea- chers' room, the main primary school office, Headmaster's office, reception room and a large store room.

The sixth floor, the largest dimension of the building, will have three classrooms, a teachers' room, а large handicraft room and a substantial sized staff room. The seventh floor will be similar in area to the sixth floor and will contain six classrooms and the teachers' room. The entire eighth floor will be occupied by the Secondary School playground which will consist of a covered area under the Robinson Road section of the building, and the open play- ground which is the roof of the Glenealy part of the school building.

The ninth floor, which is entirely on the Robinson Road side, will contain three classrooms, the General office for the Secondary School and the Headmaster's The tenth floor will have three room. further classrooms and a large teachers'

common room.

The ground floor, which is the smallest dimension of the building at the foot of the retaining wall, will have a covered playground with ample lavatory and wash room accommodation, while the first floor

Every floor, as it increases, or decreases will have room for only two classrooms

area, will have lavatory, wash room and a teachers' room with a separate and changing room facilities commensurate with the number of pupils on each floor.

lavatory.

in

Available from stock

"ARPIC" Air Compressors.

"JOHNSON" Power Rammers.

"CLIMAX" Maxbits.

"CLIMAX" Hand Hammer Drills.

"CLIMAX" Air Hose.

"VICTORIA" Concrete Mixers.

"ACE" Concrete Vibrators.

"CARVER" Pumps.

"KDK" Fans.

"DUNELT" Hollow Drilling Steal.

"SANKEY" No. 1 Wheelbarrows.

'PIRELLI" Tyres.

BLAIR & CO.LTD.

Windsor House

Rooms 212-216. Telephone 28086

**

Enquiries invited for

"BRADY" Steel Rolling Shutters & Grills. "VAN KUIJK" Flush and Panel Doors. “HEEMAF" Electric Motors.

"'BAXTER" Stone Crushing Plant. "NEWTON CHAMBERS".

Earth Moving Equipment,

Excavators, etc.

DERRICKS, MOBILE CRANES,

MONOTOWER CRANES,

DIESEL ENGINES,

DIESEL LOCOMOTIVES.

"STOTHERT & PITT" Mixing Plant. "INTERNATIONAL HARVESTER''

CRAWLER TRACTORS with attachments such as Bullgrader,

Power Winch, Anthony Loader, Skid Shovel, Pipeboom etc.