Site formation for fire station & quar- Cheung Sun ters at Hung Hom, Kowloon. $26,613.
Kee
Construction of extension to married Yee Lee & Co. staff quarters at Government House, Hong Kong. $103.245.
Reprovisioning
Road
Shun Shing Building children's playground & rest_garden Construction Co. (Stage II). Kowloon.
of Chatham
$92,079. Shan
model Yee Lee & Co.
Demolition of Ping
house at Ping Shan & 21 Bathing Sheds along West Coast of New Ter-
ritories. $11,850.
Supply of asbestos cement goods for Tsing
Yi Island Tsz Wan Shan Resettlement Estate, dustries Ltd. Block A14 (Area "A"). $101,703.
In-
Supply & laying of floor & wall til- Che Cheung Hong ing for 2 additional ward blocks at
Castle Peak Hospital, New Territor-
jes. $34,236.
Supply & installation of a passenger The Jardine Engineer. lift for Tai Po fire station, New Ter- ing Corpn. Ltd. ritories. $69,000.
Supply of metal windows & doors for Canton Metal Window Technical College classroom block Manufacturing Co., extension. Hung Hom, Kowloon. Ltd.
$28,104.
Supply & installation of a goods/- The Jardine Engineer. passenger lift at New Wool Work- ing Corpn. Ltd.
Hong Kong Metal Window Manufactur- ing Co., Ltd.
shop, Hong Kong Technical College, Hung Hom, Kowloon. $58,000. Supply of metal windows for Yuen Long resettlement estate annex school attached to Block 3. $12,960. Supply of metal windows for annex school. Ham Tin Resettlement Estate, Block "F". (extension). $12,600. Supply of metal windows & doors Canton Metal Window for Ma Tau Chung ambulance depot, Manufacturing Co., Kowloon, $16,634.
Supply & laying of mastic asphalt roofing for low cost housing at Ngau Tau Kok (Area "B"). Blocks 9, 10, 11 & 12. $42.012.
Supply of metal windows & doors to Plover Cove Rehousing (Stage II) at Tai Po. New Territories. $78.675 Electrical installation for Plover Cove Rehousing (Stage 1) at Tai Po, New Territories. $28,530.
Hong Kong Metal
Window Manufactur. ing Co., Ltd.
Ltd.
Precast Products Ltd.
Hong Kong Metal Window Manufactur. ing Co., Ltd.
The British General Electric Co., Ltd.
Supply & installation of steel fram- Sin Hwa Steel Furni. ing & slotted steel planks for storage ture & Office Equip. racks for D.C. & I. at Ocean Termin- ment Co. al. $13,110.
Supply & laying of mastic asphalt Precast Products Ltd roofing for two additional ward
blocks at Castle Peak Mental Hos-
pital, New Territories. $27,643.
Supply
&
installation of sliding & Shewan, Tomes folding metal doors for Ma Tau Chung (Equipment) Ltd. Ambulance Depot, Kowloon. $22,500.
Electrical installation for low cost Gilman & Co., Ltd. housing at Tsz Wan Shan, (Stage 1), Blocks 1 & 2.
$207.004.
Electrical installation for abattoir Shun Cheong Electric Junior staff quarters at
Kennedy & Metal Manufactur. Town. Hong Kong. $68,301.
er.
Supply & laying of mastic asphalt Precast Products Ltd. roofing for Plover Cove rehousing
(Stage II) at Tai Po, New Territories.
$18,273.
Electrical
installation at Chatham Ip Tim Electrical Co.
Road Children's Playground & Rest Garden (Stage II). Kowloon, $10,600.
Supply of asbestos cement goods for Tsing Yi Island Block 'F' extension, Ham Tin resettle- Industries Ltd. ment estate (Area 'B'). $146.605
Construction of partitions. desk and Hong Kong Teakwood counter units at Ocean Terminal, Works Ltd. Kowloon. $130,577.
Piling to foundations for fire station The Vibro Piling & and quarters at Tai Po. New Terri- International Founda- tories. $113,667.
tion Co. Ltd.
Supply and laying of mastic asphalt Precast Products Ltd. roofing to resettlement factory No. 1,
Yuen Long. $25,867,
Electrical installation at fire services Engineering Service training school, district fire headquar-
ters and ambulance depot at Sek
Kong, New Territories. $183,489
Repair to Shek Pik Catchwaters Chi Fuk Construction sections C and D. $1,043.590
Co.
Electrical installation at Ngau Tau Grandeur Electrical Kok resettlement estate blocks 2, 3, 6 Co.
& 7. $391,110
Construction of two concrete water Hop Cheong Co. tanks, fencing, etc.. at the Mount Davis Resite area, Hong Kong Island. $95.550
IT'S CHEAPER
AND BETTER
WITH BROOMWADE
BUILDING CONTRACTORS
PLUMBERS AND COUNCILS ...
will be astonished at how quickly the surprisingly small outlay for this "BROOMWADE" Compressor outfit will be repaid by slashing the present costs of **Pick and Sbovel methods
Sole Agents:-
WR120
BROOM WADE"
Rotary Air
Compressor. Patrol or Diesel driven. Delivery 120 e.ƒ m. af free air at 100 pa..
RB440
" BROOMWADE”
Pneumatic Breaker. Delis- ers 1200 blows per minute. Low air consumption. Steel shank 6′′ x 17′′ Hez. Incor- porating Swing Stirrup.
"BROOMWADE"
Air Compressors & Pneumatic Tools Your Best Investment
INNISS & RIDDLE (CHINA) LTD.
608-616, Prince's Building, Hong Kong.
Telephone: 222061
Far East Architect & Builder May, 1966
77