Overseas Project

Precast Cruciform Units Frame Research Centre

SKIDMORE, OWINGS AND MERRILL, NEW YORK architects

MATTHEWS, RYAN AND SIMPSON, LONDON

HARRIS AND SUTHERLAND, LONDON and

PAUL WEIDLINGER, NEW YORK

associate architects

MATTHEW HALL MECHANICAL SERVICES, LONDON and JAROS, BAUM AND BOLLES, NEW YORK

A. BOXALL AND PARTNERS, LONDON

TROLLOPE AND COLLS, LTD.

structural engineers

mechanical engineers

quantity surveyors

contractors

PR

RECAST concrete cruciform frame elements connected by precast edge beams have been used in the construction of a new research and administration centre for H.J. Heinz Co., Ltd., which was completed last year on a 63 acre rural site at Hayes, Middx., UK.

The frame elements, each weighing about 3 tons, are tied together in an unusual way. A duct through each vertical member accommodates a 14 in. diameter Lee McCall bar which

was tensioned as each cruciform ele- ment was erected.

As the joints between the abutting ends of the vertical members occur at eye level where they can be seen from inside the building, it was essen- tial for these to be neat and precise. Tolerances on profile of ± % in. and of 1/16 in. on meeting faces between units were achieved.

The following method of jointing was employed. The top and bottom of the vertical member of each frame

North

west corner of ad- ministration building showing composition of precast units and high-quality finish

}

28-0° or 25-4

ELEVATION

Far East Architect & Builder March, 1966

Anchorage

Coupler

Ikeda Lee-M© Call bar

[

Coupler

„Náo Let-M© Cali bor

Anchorage

Cel position ·

Edge boom

Clodding und

Line of

PLANT ROOM

EDGE BEAM SECTION

+

0:0

67