Contracts awarded

HONG KONG GOVERNMENT

Civil engineering and building works Lam Construction Co.

to superstructure of new refuse dis- posal incinerator, Kennedy Town.

$2,221,596

Lower Albert Road/Ice House Street Wah Fung & Co. junction improvement, $102,667

Junction of Arbuthnot Road/Holly- B.C. Construction Co. wood Road/Wyndham Street improve- ment. $103,975

Construction of operating theatre Tung Shan & Co. block and radiodiagnosis block at Queen Mary Hospital Extension, Hong Kong. $3,886,707

Construction of a resettlement flatted factory (No. 3) at Tsuen Wan, New Territories. $1,464,979 Nathan Road/Gascoigne Road junction improvement. $249,814

Yau Tong Resettlement Estate drains. roads and surfaces, stage II. $896,205 Construction of roads in Kwun Tong Industrial Zone 5, Section D. $419,610 Piling to foundations for Fire Services H.Q. and H.K stores and workshops at North Point. $402,840

Lai Chi

Driven Insitu Foundation Piles. boundary walls & fencing to refuse disposal incinerator plant. Kok, Kowloon. $574,295 Construction

Sang Hop Construction Co., Ltd.

Truly Construction Co.

Chi Fuk Construction Co.

Shun Wah Engineer- ing Co., Ltd. The Vibro Piling International Founda- tion Co., Ltd.

Gammon (H.K.) Ltd.

of resettlement housing Fook Kee Construc- (Block "C") at Shek Pai Wan, Hong tion Co. Kong. $3,402,119

Construction

of resettlement housing Tung Shan & Co.

(Blocks 4, 5, & 6) at Shek Lei (Area

"A"). Tsuen Wan, N.T. $7.996,419

Laying of 6 in. diameter submarine Lam Construction Co. Dipelines for Peng Chau and Hei Ling Chau Water Supplies. $528,463

Construction of resettlement housing Sang Hop Construc-

(Block "F"

Extension) at Ham Tin tion Co., Ltd.

(Area "B"), Kowloon, $4,856,702

Trunk

sewer in Tin Lok Lane and Fook Lec & Co. Marsh Road, $325,520

Construction of trunk sewer in Chung Sun Kee Wongneichong Road between Leigh-

ton Road & Blue Pool Road) $223.980 Right to quarry stone at Shek O Oriental Pioneer Road. $2,187,500

Development Co. Engineering Service

Electrical installation at Argyle Street Water-works office extension. $42,607 Supply of filter sand, $193,700 Construction of Resettlement Staff Quarters at Lo Fu Ngam/ Wang Tau Hom resettlement estates. Kowlcon. $990.830

Gosho Co., Ltd. Kwong Wing

Site formation for a resettlement Cheong Lee Construc- estate at Pak Tin (Shek Kip Mei), tion Co. Ltd. Kowloon. $8,620,556

Yuen Long Flood Control, Stage V Chi Fuk Construction (3rd Section) and Lam Hau-Shan Ha Co.

Road. $1,619,650

Manufacture of four sets of suction Taikoo Dockyard & screens for Brick Hill salt water Engineering Co.. Ltd. pumping station. $10,900

Wo Hing Construction

Laying of 27 in. diameter outlet main from Tsz Wan Shan service reservoir. Co. $256,100

Co.

Site formation for low cost housing Wing Lee Construction at Yau Tong Bay, Kowloon, $2.876,480 Construction of resettlement housing (Block A13) at Tsz Wan Shan (Area "A") Kowloon. $3,326,355

Goodman Corporation (Engineers & Build. ers) Ltd.

Construction of Ham Tin Service Chui Hing Construc- Reservoir. $2,097,042

Construction of low cost housing (Block 2) at Ngau Tau Kok (Area "A") Kowloon. $3.930,142

2

Piling to foundations for Blocks 1 & at Area "A". Ngau Tau Kok (Government low cost housing). Kowloon. $388,920

tion Co.

Dah Cheong & Co.

Gammon (H.K.) Ltd.

Trimedge

REG. U. S. PATENT OFFICE

DECORATIVE MOULDINGS OF ALUMINUM ALLOY

MANUFACTURED BY

THE WILLIAM L. BONNELL COMPANY INCORPORATED

NEWNAN, GEORGIA, U. S. A.

STOCKS AVAILABLE

SOLE AGENTS

HONG KONG ALUMINIUM LIMITED

505 Fu House, 7 Ice House Street

Far East Architect & Builder March, 1965

Phone: 23-30-73 (3 Lines)

8;

Page 55Page 56

Share This Page