50

PAVEMENT

ENTRANCE

View towards stage showing ceiling lights and intermediate corridor

between the columns at each floor level forms the standard classroom of 562 sq. ft. for a maximum of 45 students. Direct lighting and cross ventilation of classrooms is provided: this is illustrated in the cross section.

By an extension of the floor beams the service corridors are cantilevered 8 ft. over the internal well.

This cantilevering obviates the need for extra columns around the court and allows space for the three para- bolic arches which, with their beam connection and the play area above, form an entirely free-standing struc-

ture.

The three arches are separated from the rest of the building by expansion joints. Cast in situ, they are supported by six 1 in. reinforc ing bars at each pivot.

A rich concrete mix of 1:1:2 was used for the arches in conjunc- tion with eight 14 in. reinforcing bars in each, with in. binders. In the tie

||||

Folding doors at the side of the assembly hall and first ficer corridor above

0.9

STORE RU

D

ST

LAV

PLATFORM

COVERED

PLAY ARE A

GROUND FLOOR PLAN

SCALE

24 32 FT

LIBRARY

• COMMON RM

PRINCIPAL

RM

OFFICE

WAITING

MEDICAL

INSPECTION AM

-UP

TAT

CHEE

AVENUE

BIOLOGY

CLASS RM

CLASS AM

CLASS RM

ST AM

ST AN

TEACHERS' Al

CLASS RMA

OPEN

CLASS RM

SPACE

FIRST FLOOR PLAN

Far East Architect & Builder

CLASS RM

CLASS RM

CANOPY

March, 1965

Page 20Page 21

Share This Page