Kam-fai Lee

Godown

6

38 Chong Yip St. Kwun Tong

Wong Cho Tong

extension

2 blocks of

6

16 Grampian Rd.

Ng Yook Man

Yee Lee Industrial Chemical Ltd.

Ting Shu Fan

A buildings

Warehouse

7

Hoi Bun Road, Kwun Tong

C.K. Wu

Chi Lai Investment Co., Ltd.

NEW TERRITORIES

A/C Bldg.

6

A/C Bldg.

21

A/C Bldg.

6

Chung On Street, Tsuen Wan Yuen Tun Circuit, Tsuen Wan Tsuen Wan

E.Y. Wu

A/C Bldg.

6

A/C Bldg.

6

49 Texaco Road, Tsuen Wan Tsuen Wan

E.Y. Wu

E.Y. Wu

Warehouse

12

Wo Yi Hop Road, Kwai Chung

Y.T. Pei

T/C Bldg.

T/C Bldg.

T/C Bldg.

Factory

Ja a ∞ |

Factory

Factory

3 Residences

8

6

7

GION 50

Tak Wah Street, Tsuen Wan Tai Po Market

8 Wai Yi Street, Tai Po Market Pak Tin Par St. Tsuen Wan

Kwai Chung

Yeung Uk Road, Tsuen Wan

Clear Water Bay Rd., Sai Kung Ma Liu Shui, Shatin

Wilkie C.H. Tam

Chau Ho Ming

Fung Man Chi Lo Wan Kwoot

Guy W.K. Chan

Liu Hok Yan Peter Y.S. Pun

Clifford C.F. Wong T.C. Yuen

2 Blocks of

Senior Staff

and

Quarters

Marykncil

5

Ma Liu Shui, Shatin

W. Szeto

Jesuit Hostel

contracts awarded

HONG KONG

Shing Mun River Flood Control

Scheme

-

Stage I, phase III and Stage II. $1,842,450.

Completion of surfacing of roads, car parks and recreation grounds – Kwai Chung Area 9, Resettlement and Low Cost Housing Estates. $744,640.

Construction of rank and file mess at Queen's Hill Camp, New Territories. $617,658.

Construction of Tai Wan Salt Water Pumping Station. $985,352.

Prince Edward Road improvements, Stage I (Embankment Road, K.C.R. Bridge to Waterloo Road). $757,624.

Construction of access road to Shek Wu Hui pilot sewage treatment plant. $713,405.

Construction of drainage works at Tai Wan Reclamation. $216,345. Dredging for improvement in natural anchorage at Chek Keng, Long Har- bour. $402,850.

Laying of 15 in. dia. a.c. air-condi- tioning main from Yau Ma Tei pump- ing station to New Government Office Building Yau Ma Tei Gov- ernment Slipway reprovisioning Stage II. $164,805.

-

Construction of Kai Tak East Play- ground (Stage 1) at San Po Kong, Kowloon. $510,662.

Societe Francaise d'Enterprises de Dragages et de Travaux Publics

Societe Francaise d'Enterprises de Dragages et de Travaux Publics

T.S. Wong & Co.

Lam Construction Co.

Ching Hing Const. Co., Ltd.

Societe Francaise d'Entreprises de Dragages et de Travaux Publics

Chit Wing Construction Co.

Universal Dockyard, Ltd.

Wo Hing Construction Co., Ltd.

Ngai Yuen Kee Construction Co.

Combined Enterprises Co., Ltd. Lee Kwun Development Co., Ltd. Cheong Ning Enterprises Ltd. Deacon T.K. Chiu

Cheong Ning Enterprises Ltd. W.H. Chou

Kin On Development Co., Ltd. Siu On Land Investment Co., Ltd. Yu Kwok Din

Danemann Watch Case

Factory Ltd.

Wong Yam Ping

Kiu Foong Enamel Factory (HK) Ltd.

Huo Pao Tsai

The Chinese University of Hong Kong

United College, The Chinese University of Hong Kong

Construction of seawall for Tong Mi Road extension and reclamation, stage 1. $3,068,870.

Electrical rewiring for Mark I and II Domestic Resettlement Housing (Blocks 8-14 incl.) at Tai Hang Tung. Kowloon. $515,000.

Supply of asbestos cement goods for New Mark VI Domestic Resettlement Housing (Blocks 16-20 incl. and estate school 8) at Ham Tin (area "B"), Kowloon. $621,116.

Supply, installation and commission- ing of laundry equipment for Medical & Health Department Laundry (Shau Kei Wan Hospital). (1) $2,213,164, (2) $422,625.

Installation of steam pipework for Lai Chi Kok incinerator turbo alter- nator. $51,000.

Electrical installation for Domestic Resettlement Housing (Blocks 1 and 2) at Sau Mau Ping (stage III), Kow- loon. $399,500.

Electrical rewiring for Mark I and II Domestic Resettlement Housing (Blocks 1-10 incl. and 29) at Shek Kip Mei, Kowloon. $484,909. Electrical rewiring for Mark I and II Domestic Resettlement Housing (Blocks 1-7 incl.) at Tai Hang Tung, Kowloon. $324,190.

Construction of children's play- ground at Pak Tin Village, Sha Tin (Lower Shing Mun Dam Resettle- ment area). $10,850.

Construction of children's play- ground at Mui Tze Lam, Sha Tau Kok. $14,964.

Site formation works for Yuen Tun Village at Tsing Lung Tau, New Ter- ritories. $129,825.

Construction of Amenity Plot at Ka Wai Man Road, Hong Kong. $47,336.

Construction of San Po Kong Sitting- Out Area, Kowloon. $27,409.

Dickson Construction Co.

The China Engineers Ltd.

Tsing Yi Island Industries Ltd.

(1) Swedish Trading Co. (2) Arnhold Trading Co., Ltd.

Chung Wah Shipbuilding

Ltd. & Engineering Co.,

Gilman & Co., Ltd.

Shun Cheong Elec. Eng. & Metal Mfer. Co.

Shun Cheong Elec. Eng. & Metal Mfer. Co.

Sun Kee Construction Co.

Yau Choi Kee Construction Co.

Tung Cheung Construction Co.

Luen Sang Construction Co. Hung Yue & Co.

Far East BUILDER, June 1970

47

Share This Page