Address
Pennefather Road Jalan Jentera Jurong
Lorong Buang Kok
SINGAPORE RURAL BOARD
Ng Yam Peng
Owner
Bhadelia Jurong
Henry Realty &
Construction Ltd.
Joo Chiat Road & Fowlie Road Wong Tak Bukit Timah Road
Lorong 'N', Telok Kurau/East Coast Rd. Lengkong Satu East Coast Road Jalan Raya
Upper Thomson Road Upper Thomson Road Binjai Park Everitt Road Sembawang Hills Drive
Chestnut Drive
Upper Thomson Road 15-A, St. Helier's Avenue Yio Chu Kang Road,
112 m.s.
Joo Chiat Road
Hume Industries (FE) Ltd. Ng Bok Beng
Mohamed Bin Siraj Dr. Tan Seng Hong Mdm. Tang Soon Hoe Yew Lian Ltd. Yew Lian Ltd.
Mr. & Mrs. Low Seow Whatt Lam Yam Wan
The Singapore Government
Officers Co-operative Housing Society Ltd. The Convent of the Holy Infant Jesus Yew Lian Ltd.
L. M. Charles
Lim Cho Hou
Tong Lee Co. Ltd.
Architect
Robert F. N. Kan G. C. Pereira K. N. Lekshmanan
Lee Kum Kit M. Fam Yue Onn Ho Yut Choon
Ee Hoong Chwe & Co. A. C. Kang
James N. Lockerbie Lee Sian Teck Lee Sian Teck Albert H. K. Hong Ho Yut Choon Rex Koh Kim Chuan
W. Irving Watson
Lee Sian Teck Edwin S. H. Choo Chuah Yet Lian
Ho Yut Choon
Description
4 two-storey terrace houses. Extension to factory.
8 two-storey terrace houses.
Three-storey flats (12 dwellings). Factory.
One block of three-storey flats
(6 dwellings).
Bungalow.
One 2-storey bungalow.
Pair of semi-detd. bungalows. 52 terrace houses.
49 terrace houses.
Two-storey bungalow.
3 two-storey terrace-houses.
Housing developments (206 dwellings).
Girl's home and convent.
35 two-storey terrace houses. Two-storey bungalow. House.
Two shops with 4 flats over.
Contracts awarded
HONG KONG GOVERNMENT
Supply and laying of mastic asphalt Precast Products Ltd. roofing to Block 40, Sau Mau ping resettlement housing (Stage II), Kow-
loon. $16,405
Supply and installation of metal roller The Honest Shutter grilles for seven standard fire stations Industrial Co. and ambulance depots. $17,893
Supply of metal windows for three Canton Metal Window estate schools at Ngau Tau Kok re- Manufacturing Co., settlement
(Blocks 8-12), Ltd. Kowloon. $36,864
housing
Supply of metal windows and doors for Hung Hom Fire Station, Kowloon. $15,717 Supply of metal windows for staff training school and prison officers' quarters, Stanley Prison, Hong Kong. $40,937
Hong Kong Metal Win- dow Manufacturing Co., Ltd. China Steel Works Ltd.
Hong
Kong
Metal
Supply of metal windows & sliding & folding metal casement doors for Window Manufacturing police inspectorate quarters, Park Co., Ltd. Road, Hong Kong. $77,950
Supply of asbestos cement goods for Tsing Yi Island Sau Mau Ping resettlement housing industries Ltd. (Block 28), Stage II, Kowloon. $134,564
Supply of asbestos cement goods for Tsing Yi Island Sau Mau Ping resettlement housing Industries Ltd. (Blocks 26 & 27), Stage II, Kowloon.
$226,760
Supply and laying of mastic asphalt British Orient Ltd. roofing to resettlement housing Block
38. Sau Mau Ping (Stage II), Kowloon.
$17,365
Electrical installation for 24 bed rural Hip Hing Electric Co. clinic and maternity home at Castle
Peak, New Territories. $33,938
Electricity supply for Jordan Road China Light & Power seawater pumphouse, Kowloon. Co., Ltd. $14,677
Construction of Ho Man Tin fresh Kumagai Gumi Co. Ltd. water service reservoir Plover Cove
Water Scheme, stage II. $3,857,045
Extension of stormwater drains, phase Tai Foo Co.
Central Reclamation,
$522,212
stage II.
Laying of fresh and salt water trunk Wo Hing Construction mains, Tsuen Wan West. $312,891
Far East Architect & Builder June, 1967
Co. Ltd.
Construction of domestic resettlement Dah Cheng & Co. housing blocks 19 and 20 and estate school 2 at Sau Mau Ping, stage II. $3,489,700
Construction of fresh water pump Yee Lee & Co. house for Beacon Hill water supply. $172,722
Re-siting of Radio Hong Kong's Chee Cheung Hing & medium wave transmitters to Smug- Co. glers Ridge,
$679,961
near Sha
Tin,
N.T.
Manufacture of surge suppression Tai Koo Dockyard & pressure vessels for Magazine Gap, Engineering Co. Ltd. Beacon Hill Fresh Water/Salt Water
Pumping Stations. $48,950
Construction of Heung Yee Kuk Yee Lee & Co.
Secondary School, Yuen Long.
$1,875,780
Road surfacing in part of Ho Man Tin Chui Hing Construc- stage
and Fat Kwong Street, tion Co. Ltd. $617,137
Construction of box culvert hillside Tai Foo Co. east of Tin Hau Temple Road. $532,561
Construction of river wall for areas 12 and 17-Castle Peak New Town, stage 1A. $1,998,715
Fabrication and installation of two 15,000-gallon horizontal fuel oil storage tanks at Kennedy Town Abattoir. $47,962
Societe Francaise d'Entreprises de Dragages et de Tra- vaux Publics Lee Tung Wo Ltd.
Piling to foundations for blocks 24 and Gammon (HK) Ltd. 25 and Estate School 3, 4 and 5 at
Sau Mau Ping Resettlement Estate,
stage II. $430,104
Construction of domestic resettlement Goodman
Corporation
housing blocks 21-25 inclusive and (Engineers & Builders) Estate Schools 3, 4 and 5, at Sau Mau Ltd.
Ping, stage II. $13,351,817
Construction of roads, drains and Barbican Construction surfaces for Yau Tong Resettlement Co. and Low Cost Housing Estates, stage
IV. $828,475
Cheung
Con-
Construction of concrete footpath and Tung retaining wall from pier at Wong Shek struction Co. to Ha Yeung Village, Sai Kung (North). $26,680
69