Address

Pennefather Road Jalan Jentera Jurong

Lorong Buang Kok

SINGAPORE RURAL BOARD

Ng Yam Peng

Owner

Bhadelia Jurong

Henry Realty &

Construction Ltd.

Joo Chiat Road & Fowlie Road Wong Tak Bukit Timah Road

Lorong 'N', Telok Kurau/East Coast Rd. Lengkong Satu East Coast Road Jalan Raya

Upper Thomson Road Upper Thomson Road Binjai Park Everitt Road Sembawang Hills Drive

Chestnut Drive

Upper Thomson Road 15-A, St. Helier's Avenue Yio Chu Kang Road,

112 m.s.

Joo Chiat Road

Hume Industries (FE) Ltd. Ng Bok Beng

Mohamed Bin Siraj Dr. Tan Seng Hong Mdm. Tang Soon Hoe Yew Lian Ltd. Yew Lian Ltd.

Mr. & Mrs. Low Seow Whatt Lam Yam Wan

The Singapore Government

Officers Co-operative Housing Society Ltd. The Convent of the Holy Infant Jesus Yew Lian Ltd.

L. M. Charles

Lim Cho Hou

Tong Lee Co. Ltd.

Architect

Robert F. N. Kan G. C. Pereira K. N. Lekshmanan

Lee Kum Kit M. Fam Yue Onn Ho Yut Choon

Ee Hoong Chwe & Co. A. C. Kang

James N. Lockerbie Lee Sian Teck Lee Sian Teck Albert H. K. Hong Ho Yut Choon Rex Koh Kim Chuan

W. Irving Watson

Lee Sian Teck Edwin S. H. Choo Chuah Yet Lian

Ho Yut Choon

Description

4 two-storey terrace houses. Extension to factory.

8 two-storey terrace houses.

Three-storey flats (12 dwellings). Factory.

One block of three-storey flats

(6 dwellings).

Bungalow.

One 2-storey bungalow.

Pair of semi-detd. bungalows. 52 terrace houses.

49 terrace houses.

Two-storey bungalow.

3 two-storey terrace-houses.

Housing developments (206 dwellings).

Girl's home and convent.

35 two-storey terrace houses. Two-storey bungalow. House.

Two shops with 4 flats over.

Contracts awarded

HONG KONG GOVERNMENT

Supply and laying of mastic asphalt Precast Products Ltd. roofing to Block 40, Sau Mau ping resettlement housing (Stage II), Kow-

loon. $16,405

Supply and installation of metal roller The Honest Shutter grilles for seven standard fire stations Industrial Co. and ambulance depots. $17,893

Supply of metal windows for three Canton Metal Window estate schools at Ngau Tau Kok re- Manufacturing Co., settlement

(Blocks 8-12), Ltd. Kowloon. $36,864

housing

Supply of metal windows and doors for Hung Hom Fire Station, Kowloon. $15,717 Supply of metal windows for staff training school and prison officers' quarters, Stanley Prison, Hong Kong. $40,937

Hong Kong Metal Win- dow Manufacturing Co., Ltd. China Steel Works Ltd.

Hong

Kong

Metal

Supply of metal windows & sliding & folding metal casement doors for Window Manufacturing police inspectorate quarters, Park Co., Ltd. Road, Hong Kong. $77,950

Supply of asbestos cement goods for Tsing Yi Island Sau Mau Ping resettlement housing industries Ltd. (Block 28), Stage II, Kowloon. $134,564

Supply of asbestos cement goods for Tsing Yi Island Sau Mau Ping resettlement housing Industries Ltd. (Blocks 26 & 27), Stage II, Kowloon.

$226,760

Supply and laying of mastic asphalt British Orient Ltd. roofing to resettlement housing Block

38. Sau Mau Ping (Stage II), Kowloon.

$17,365

Electrical installation for 24 bed rural Hip Hing Electric Co. clinic and maternity home at Castle

Peak, New Territories. $33,938

Electricity supply for Jordan Road China Light & Power seawater pumphouse, Kowloon. Co., Ltd. $14,677

Construction of Ho Man Tin fresh Kumagai Gumi Co. Ltd. water service reservoir Plover Cove

Water Scheme, stage II. $3,857,045

Extension of stormwater drains, phase Tai Foo Co.

Central Reclamation,

$522,212

stage II.

Laying of fresh and salt water trunk Wo Hing Construction mains, Tsuen Wan West. $312,891

Far East Architect & Builder June, 1967

Co. Ltd.

Construction of domestic resettlement Dah Cheng & Co. housing blocks 19 and 20 and estate school 2 at Sau Mau Ping, stage II. $3,489,700

Construction of fresh water pump Yee Lee & Co. house for Beacon Hill water supply. $172,722

Re-siting of Radio Hong Kong's Chee Cheung Hing & medium wave transmitters to Smug- Co. glers Ridge,

$679,961

near Sha

Tin,

N.T.

Manufacture of surge suppression Tai Koo Dockyard & pressure vessels for Magazine Gap, Engineering Co. Ltd. Beacon Hill Fresh Water/Salt Water

Pumping Stations. $48,950

Construction of Heung Yee Kuk Yee Lee & Co.

Secondary School, Yuen Long.

$1,875,780

Road surfacing in part of Ho Man Tin Chui Hing Construc- stage

and Fat Kwong Street, tion Co. Ltd. $617,137

Construction of box culvert hillside Tai Foo Co. east of Tin Hau Temple Road. $532,561

Construction of river wall for areas 12 and 17-Castle Peak New Town, stage 1A. $1,998,715

Fabrication and installation of two 15,000-gallon horizontal fuel oil storage tanks at Kennedy Town Abattoir. $47,962

Societe Francaise d'Entreprises de Dragages et de Tra- vaux Publics Lee Tung Wo Ltd.

Piling to foundations for blocks 24 and Gammon (HK) Ltd. 25 and Estate School 3, 4 and 5 at

Sau Mau Ping Resettlement Estate,

stage II. $430,104

Construction of domestic resettlement Goodman

Corporation

housing blocks 21-25 inclusive and (Engineers & Builders) Estate Schools 3, 4 and 5, at Sau Mau Ltd.

Ping, stage II. $13,351,817

Construction of roads, drains and Barbican Construction surfaces for Yau Tong Resettlement Co. and Low Cost Housing Estates, stage

IV. $828,475

Cheung

Con-

Construction of concrete footpath and Tung retaining wall from pier at Wong Shek struction Co. to Ha Yeung Village, Sai Kung (North). $26,680

69

Share This Page