Contracts awarded

HONG KONG GOVERNMENT

Construction of concrete footpath from Kui Kee Construction pier to Kau Lau Wan and Tan Ka Co. Wan, Sai Kung (North). $18,300

Construction

Construction of a clinic at Tin Kwong Kai Tai Construction Road Police Quarters, Kowloon. $53,450 Co. Construction of King George V Kai Tai Memorial Park Library & children's Co. playground at Canton Road, Kowloon. $72,160

Construction of Lo Fu Ngam Park Kwong Tai & Co. (Stage II), Kowloon. $59,281

Site formation at Piper's Hill, Kowloon, $131,398

Construction of a temporary hawker bazaar in Kowloon City. $37,876 Demolition of M.P.B.W. Office Build ings at Victoria Barracks, Hong Kong. $5,500

Dickson Co.

Construction

Cheng Tai Construc- tion Co.

Wing Loong Co.

Supply and laying of mastic asphalt Precast Products Ltd. roofing for Blocks 13 and 14 at Ngau

Tau Kok Resettlement Estate, Kow-

loon. $24,239

Supply of asbestos cement goods to Tsing Yi Island Indus- Block 29 at Sau Mau Ping Resettle- tries Ltd.

ment Estate (Stage II), Kowloon.

$134,588

Piling to foundations for railway staff Wah Yip & Co. quarters at Ho Tung Lau, Sha Tin,

New Territories. $53,128

Kong Metal Windows Manufactur- ing Co., Ltd.

Supply of metal windows for estate Hong school adjacent to Block "E" at Ham Tin Resettlement Estate (Area "A"), Kowloon. $11,000

Supply of aluminium air intake louvres for Cheung Sha Wan Abattoir, Kow- loon. £7,917

Supply and fixing of metal roller shutters at Kennedy Town Abattoir, Hong Kong. 648,493

Supply and laying mastic asphalt roofing for Tsz Wan Shan low cost Housing (Stage 1), Kowloon. $33,435 Piling to foundations for new sub- divisional police station at Aberdeen. $116,778 Construction of police post, cargo ex- amination shed and public latrine at Man Kam To. $258,503

Colt Ventilation Heating Ltd.

Electrical installation for block No. 7 The British General Shek Lei resettlement estate (Area C), Electrical Co., Ltd. N.T. $122,000

Supply of metal windows, doors & Canton Metal Window flyscreens for clinic & maternity home, Manufacturing Co., Ltd. at Castle Peak, N.T. $30,149

Piling to foundations for new con- Paul Lee Engineering valescent block at Kowloon Hospital. Co., Ltd. $153,500

Supply of adjustable metal louvre Precast Products Ltd. window frames for department quarters

at Au Tau, N.T. $23,466

Supply of metal windows, door, louvres China Steel Works Ltd. and flyscreens for Queen Mary Hos- pital (alterations to existing building),

Hong Kong

$126,153

Supply of adjustable metal louvre Precast Products Ltd. window frames for Queen Mary Hos-

pital (alterations to existing building),

Hong Kong. $16,314

Electrical installation for the re-siting The

British General

of medium wave transmitters at Smug- Electric Co., Ltd. glers' Ridge, Nr. Shatin, N.T. $65,000

Supply & laying of floor & wall tiling Che Cheung Hong for clinic & maternity home at Castle

Peak, N.T. $51,462

Supply and laying of mastic asphalt Vai Cheong Co. roofing to Block 'A', Shek Pai Wan

resettlement estate, Aberdeen. $16,500

Supply of hollow core flush doors at Tat Cheong Hong Low Cost Housing (Stage 1), Tsz Wan

Shan, Kowloon. $23,528

Supply and laying of floor and wall Che Cheung Hong tiling for departmental quarters at Au

&

Tau, N.T.

The Gosho Co., Ltd. (Succeeded by Suzuki Shutter Co. (Hong Kong) Ltd. Vai Cheong Co.

Franki Piling & En- gineering (Hong Kong) Ltd.

Tai Hing (Engineers & Builders) Ltd.

Miscellaneous works at Kwai Chung Ching Hing Construc- North Development, Area 9, stage I. tion Co. Ltd. $1,080,669

Construction of trunk sewers in Hillier Chit Wing Construction Street and Man Wah Lane. $242,910 Co.

Supply and installation of 6 lifts for Fuji Engineering Co. Blocks 32 and 33 at Sau Mau Ping (HK) Ltd. resettlement estate, stage 11. $398,200

Electrical installation at Lai Chi Kok Sheung Kwong Electric incinerator plant, stage I.

$12,963 Co.

Construction of Lai Chi Kok trunk Tai Foo Co.

sewer (from the east side of Water

Boat Dock to the junction of the future

roads opposite N.K.I.L. 5087). $473,525

Construction of Government low cost Goodman

Corporation

housing estate domestic blocks 7, 8 (Engineers & Builders) and 9 and estate school 3 at Yau Tong Ltd.

Bay, Kowloon. $5,143,100

Site development above Tin Hau Tem- Nishimatsu Construc- ple Road, North Point. $1,383,116

Construction of virology laboratory at Castle Peak, N.T. $78,616

tion Co. Ltd. Ngai Yuen Kee Construction Co.

Hing Kee Construction

Construction and completion of an ex- tension to maternal & child health Co. centre at Kowloon City. $78,691

Demolition & alterations to godowns Ah Mee Co. and fire services buildings in Canton

Road, Kowloon. $29,500 (payable to

Govt.)

Construction of a public latrine & Cheng Tai Construc- bathhouse at Ngau Tau Kok Road, tion Co. Kowloon. $120,813

Construction of trade training block at Hing Kee Construction Castle Peak Boys' Home, N.Ť. $68,184 Co., Ltd.

J

$56,424

Supply and laying of mastic asphalt Precast Products Ltd. roofing for departmental quarters at

Au Tau, N.T. $43,177

Supply and fixing sliding and folding Deacon & Co., Ltd. metal doors at Hung Hom fire station,

Kowloon.

$27,360

Supply and laying of mastic_asphalt Precast Products Ltd. roofing for Blocks 44 and 45. Sau Mau

Ping resettlement estate (Stage II), Kowloon. $28,615

Supply and laying of mastic asphalt Precast Products Ltd. roofing to Blocks 4 and 5, Ngau Tau

Kok resettlement estate, Kowloon. $40,182

Electrical installation for Blocks 32 Ip Tim Electrical Co. and 33 and estate school at Sau Mau

Ping resettlement estate (Stage II), Kowloon. $180,000

Supply and laying of floor and wall Che Cheung Hong tiling for staff training school and

prison officers' quarters at Stanley. $48,884

Construction of Fleming Road flyover Fung Kau Kee and associated roads and drainage works, stage I. $2,719,309

Construction of Kowloon Bay seawall, Fung Kau Kee part II. $1,378,689

Construction of staff quarters for Chan Tao Contractor Sheung Shui/Tai Po Supply, stage II.

$220,047

Interim improvements to Aberdeen Chit Wing Construction Main Road and Wong Chuk Hang Road Co.

section between Wu Nam Street

and A.I.L. 152. $95,269

Reconstruction of Kin Wah Street. Chit Wing Construction $107,192

Co.

Construction of Yee Kuk Street (Hai Tai Foo Co.

Tan Street) intercepting sewers and

Kweilin Street/Pei Ho Street sewer,

stage I. $732,306

Supply of asbestos cement goods to Tsing Yi Island Indus- Shek Lei resettlement estate, Area tries, Ltd.

"A", Blocks 1, 2 and 3 and estate

school. $370,745

Piling to foundations for Blocks 66 Gammon (HK) Ltd. and 67 and estate school No. 3 at Tsz Wan Shan resettlement estate, Area "F". $528,015

Far East Architect & Builder July, 1967

79

Share This Page