Contracts awarded
HONG KONG GOVERNMENT
Construction of concrete footpath from Kui Kee Construction pier to Kau Lau Wan and Tan Ka Co. Wan, Sai Kung (North). $18,300
Construction
Construction of a clinic at Tin Kwong Kai Tai Construction Road Police Quarters, Kowloon. $53,450 Co. Construction of King George V Kai Tai Memorial Park Library & children's Co. playground at Canton Road, Kowloon. $72,160
Construction of Lo Fu Ngam Park Kwong Tai & Co. (Stage II), Kowloon. $59,281
Site formation at Piper's Hill, Kowloon, $131,398
Construction of a temporary hawker bazaar in Kowloon City. $37,876 Demolition of M.P.B.W. Office Build ings at Victoria Barracks, Hong Kong. $5,500
Dickson Co.
Construction
Cheng Tai Construc- tion Co.
Wing Loong Co.
Supply and laying of mastic asphalt Precast Products Ltd. roofing for Blocks 13 and 14 at Ngau
Tau Kok Resettlement Estate, Kow-
loon. $24,239
Supply of asbestos cement goods to Tsing Yi Island Indus- Block 29 at Sau Mau Ping Resettle- tries Ltd.
ment Estate (Stage II), Kowloon.
$134,588
Piling to foundations for railway staff Wah Yip & Co. quarters at Ho Tung Lau, Sha Tin,
New Territories. $53,128
Kong Metal Windows Manufactur- ing Co., Ltd.
Supply of metal windows for estate Hong school adjacent to Block "E" at Ham Tin Resettlement Estate (Area "A"), Kowloon. $11,000
Supply of aluminium air intake louvres for Cheung Sha Wan Abattoir, Kow- loon. £7,917
Supply and fixing of metal roller shutters at Kennedy Town Abattoir, Hong Kong. 648,493
Supply and laying mastic asphalt roofing for Tsz Wan Shan low cost Housing (Stage 1), Kowloon. $33,435 Piling to foundations for new sub- divisional police station at Aberdeen. $116,778 Construction of police post, cargo ex- amination shed and public latrine at Man Kam To. $258,503
Colt Ventilation Heating Ltd.
Electrical installation for block No. 7 The British General Shek Lei resettlement estate (Area C), Electrical Co., Ltd. N.T. $122,000
Supply of metal windows, doors & Canton Metal Window flyscreens for clinic & maternity home, Manufacturing Co., Ltd. at Castle Peak, N.T. $30,149
Piling to foundations for new con- Paul Lee Engineering valescent block at Kowloon Hospital. Co., Ltd. $153,500
Supply of adjustable metal louvre Precast Products Ltd. window frames for department quarters
at Au Tau, N.T. $23,466
Supply of metal windows, door, louvres China Steel Works Ltd. and flyscreens for Queen Mary Hos- pital (alterations to existing building),
Hong Kong
$126,153
Supply of adjustable metal louvre Precast Products Ltd. window frames for Queen Mary Hos-
pital (alterations to existing building),
Hong Kong. $16,314
Electrical installation for the re-siting The
British General
of medium wave transmitters at Smug- Electric Co., Ltd. glers' Ridge, Nr. Shatin, N.T. $65,000
Supply & laying of floor & wall tiling Che Cheung Hong for clinic & maternity home at Castle
Peak, N.T. $51,462
Supply and laying of mastic asphalt Vai Cheong Co. roofing to Block 'A', Shek Pai Wan
resettlement estate, Aberdeen. $16,500
Supply of hollow core flush doors at Tat Cheong Hong Low Cost Housing (Stage 1), Tsz Wan
Shan, Kowloon. $23,528
Supply and laying of floor and wall Che Cheung Hong tiling for departmental quarters at Au
&
Tau, N.T.
The Gosho Co., Ltd. (Succeeded by Suzuki Shutter Co. (Hong Kong) Ltd. Vai Cheong Co.
Franki Piling & En- gineering (Hong Kong) Ltd.
Tai Hing (Engineers & Builders) Ltd.
Miscellaneous works at Kwai Chung Ching Hing Construc- North Development, Area 9, stage I. tion Co. Ltd. $1,080,669
Construction of trunk sewers in Hillier Chit Wing Construction Street and Man Wah Lane. $242,910 Co.
Supply and installation of 6 lifts for Fuji Engineering Co. Blocks 32 and 33 at Sau Mau Ping (HK) Ltd. resettlement estate, stage 11. $398,200
Electrical installation at Lai Chi Kok Sheung Kwong Electric incinerator plant, stage I.
$12,963 Co.
Construction of Lai Chi Kok trunk Tai Foo Co.
sewer (from the east side of Water
Boat Dock to the junction of the future
roads opposite N.K.I.L. 5087). $473,525
Construction of Government low cost Goodman
Corporation
housing estate domestic blocks 7, 8 (Engineers & Builders) and 9 and estate school 3 at Yau Tong Ltd.
Bay, Kowloon. $5,143,100
Site development above Tin Hau Tem- Nishimatsu Construc- ple Road, North Point. $1,383,116
Construction of virology laboratory at Castle Peak, N.T. $78,616
tion Co. Ltd. Ngai Yuen Kee Construction Co.
Hing Kee Construction
Construction and completion of an ex- tension to maternal & child health Co. centre at Kowloon City. $78,691
Demolition & alterations to godowns Ah Mee Co. and fire services buildings in Canton
Road, Kowloon. $29,500 (payable to
Govt.)
Construction of a public latrine & Cheng Tai Construc- bathhouse at Ngau Tau Kok Road, tion Co. Kowloon. $120,813
Construction of trade training block at Hing Kee Construction Castle Peak Boys' Home, N.Ť. $68,184 Co., Ltd.
J
$56,424
Supply and laying of mastic asphalt Precast Products Ltd. roofing for departmental quarters at
Au Tau, N.T. $43,177
Supply and fixing sliding and folding Deacon & Co., Ltd. metal doors at Hung Hom fire station,
Kowloon.
$27,360
Supply and laying of mastic_asphalt Precast Products Ltd. roofing for Blocks 44 and 45. Sau Mau
Ping resettlement estate (Stage II), Kowloon. $28,615
Supply and laying of mastic asphalt Precast Products Ltd. roofing to Blocks 4 and 5, Ngau Tau
Kok resettlement estate, Kowloon. $40,182
Electrical installation for Blocks 32 Ip Tim Electrical Co. and 33 and estate school at Sau Mau
Ping resettlement estate (Stage II), Kowloon. $180,000
Supply and laying of floor and wall Che Cheung Hong tiling for staff training school and
prison officers' quarters at Stanley. $48,884
Construction of Fleming Road flyover Fung Kau Kee and associated roads and drainage works, stage I. $2,719,309
Construction of Kowloon Bay seawall, Fung Kau Kee part II. $1,378,689
Construction of staff quarters for Chan Tao Contractor Sheung Shui/Tai Po Supply, stage II.
$220,047
Interim improvements to Aberdeen Chit Wing Construction Main Road and Wong Chuk Hang Road Co.
section between Wu Nam Street
and A.I.L. 152. $95,269
Reconstruction of Kin Wah Street. Chit Wing Construction $107,192
Co.
Construction of Yee Kuk Street (Hai Tai Foo Co.
Tan Street) intercepting sewers and
Kweilin Street/Pei Ho Street sewer,
stage I. $732,306
Supply of asbestos cement goods to Tsing Yi Island Indus- Shek Lei resettlement estate, Area tries, Ltd.
"A", Blocks 1, 2 and 3 and estate
school. $370,745
Piling to foundations for Blocks 66 Gammon (HK) Ltd. and 67 and estate school No. 3 at Tsz Wan Shan resettlement estate, Area "F". $528,015
Far East Architect & Builder July, 1967
79