Preparing membrane for grouting. Bitumenised felt laid first

KINAL

Polythene layer used to prevent loss of grout is sealed with adhesive strip

Care is taken to seal the polythene around pile caps

The polythene is sandwiched for protection

The screened gravel is laid as the porous layer to be grouted

62

The gravel is sealed with stiff mortar before concrete is cast. Chicken wire is used to hold gravel on sloping surfaces

Far East Architect & Builder July, 1967

Share This Page