Top left: Circular dining table and chairs are part of the specially designed dining room and bedroom furniture provided by a local firm of manufacturers. Part of the living room furniture is imported from Sweden and part is made locally

Top right: Decorated rock garden can be seen in this view of one of the wide bal- conies at tenth floor level

Left: Ground floor main entrance lobby has timber ceiling and mosaic tiled walls and flooring

Kwang Electric.

Costs

The piling contract was completed in three weeks, but the original build- ing time of 12 months was long delay- ed owing to financial difficulties of the contractor and his inability to secure skilled labour. Negotiations for termi- nation of the contract and the employ- ment of a succeeding contractor result- ed in a total delay of nine months in completion, bringing the total building time to 22 months.

The total building cost, including piling and all services was approx- imately S$1,488,000. This was made-

up as follows:

acoustic ceilings aluminium works Coraltex finishes

5,567.00

103,584.00

Sanitary installation

57,760.00

Electric Co.

63,260.00

lifts

floor and wall tiling electrical works retaining wall and

boundary walls light fittings water heaters

Nam Fang

Lifts General Electric Co. (S)

65,519.26 Pte. Ltd. 44,915.00

Floor and wall tiling Lee Kim Soo Ltd.

-

29,113.20 Coraltex finishes Natural Indus- 28,655.20 trial Enterprises.

9,080.91

curtains, curtain tracks

& blinds

Aluminium works Diethelm & Co. Ltd.

40,397.66

furniture refrigerators

19,590.00

-

Built-in furniture Lim Kah Ngam

-

Waterproofing and insulation 111,218.10 William Jacks & Co. (S) Sdn. Bhd.

61,688.00 (S) Pte. Ltd.

Carpets

Van Hin Furniture Co.

Dining and bedroom furniture - Design Mobel Pte. Ltd.

Lounge furniture Van Hin Furni-

-

air-conditioners

carpets

17,818.00

fountain equipment

1,539.00

Pte. Ltd.

fire-fighting equipment

905.00

r.c. piling

S$47,156.05

lettering

476.20

main building work

556,725.48

planting and decoration

1,809.00

waterproofing and

ture Co. Pte. Ltd.

Sub-contractors

insulation

10,485.80

Curtains and curtain tracks

-

Au

built-in furniture

103,848.00

minor sewer and sanitary

cluded:

works

96,762.60

Sub-contractors and suppliers in- Furnishing & Textiles Co.

Electrical installation Lee Seng Climate Engineering Pte. Ltd.

Refrigerators and airconditioners -