3rd FLOOR *0

14 FLOOR

meor

BRAN BUNKERS

FLOUR BUNKERS

LONGITUDINAL SECTION

#

FUTURE EXTENSION

F

Ľ

I

PLANSIFTER ROOM

BOLTING MACHINE ROOM

1:

ROLLER MILL

TRANSMISSION & MOTOR ROOM

11

TEMPERING BINS

MIXING BINS

SUPPORTING WALLS

SILO PENT-HOUSE

GRAIN STORAGE SILOS

The cleaning section is equipped with the following machinery:-

1. Volume Measurers for ac-

curate wheat blending.

2. Worm Conveyors, 3. Elevators,

4. Milling Separator for remov- ing coarse and light impurities from the cereal.

5. Magnetic Separator for ex- tracting tramp iron from grain.

6. Trieuro for eliminating round and long seeds which lower the quality of the finished product.

7. Spiral seed separators for the subdivision of seeds rejected by high yield cockle cylinders and milling separator,

8. Scourer for intensive cleaning

of cereal,

9. Combined Washer, Stoner and Whizzer for thorough washing and stone removal, Grain Damper for moistening the wheat,

10.

11. Pneumatic conveying system, 12. Separator-Aspirator for clean-

ing cereals,

13. Automatic Weigher, 14. Pneumatic Atomizing Damper for moistening, flavouring, sterilizing and adding vitamins.

(d) Mill Section.

This section consists of Rollermills, Plansifters, Middling Purifiers and Bran Finishers. The first three plants are installed on three different floor levels and connected by means of medium-pressure pneumatic convey- ing systems.

Both the cleaning section and mill

section floors have been carefully planned to satisfy the machine layout and all the openings required were boxed out during the concreting. (e) Storage Section.

flour

of

This section consists of bunkers and a bran bunker to store the products and by-products, The double flour Mixer is installed under each flour bunker to give a homo- genous mixing, consistant types flour and rapid and even discharge. Packing equipment is also installed which serves to fill both valve and normal types of sacks and for mea- suring and mixing.

Structural Design

A cantilever type all welded steel truss has been used to carry the in- take pipeline across the road to the

STORAGE SECTION

TYPICAL PLAN

ם

O CO

1:

LANE

MILL SECTION

CLEANING 4

SECTION

SILOS

T

OFFICE

BOUNDARY PENCE

LAI

YIP STREET

: יי

SILD WORKING TOWER

TODE PATH

1101

Far East Architect & Builder January, 1967