FREE = RRIF = 2000 = 'BERE
Main building with treaty room on left
Annexe
The annexe is three storeys high and maintains externally the same expres- sion as for the main office block. All concrete work, including that of the other buildings, was cast in situ using timber shuttering and scaffolding.
Contractors
The contractors were Ng Goon Han Constructions Co. Ltd. for the main building, and Siah Bros. Trading Co. for the annexe.
Sub-contractors and suppliers in-
cluded:
Strongroom doors and safes: Sime
Darby (M) Ltd.
Aluminium doors and fins: main building-China Engineers Ltd.: annexe-Diethelm & Co. Ltd. Malco Aluminium Works. Galvanised metal windows: main building-Sime Darby (M) Ltd.; annexe-William Jacks & Co. (M) Ltd.
Fibrous plaster board ceiling:
Brady's (M) Ltd.
Air conditioning installation: Sime
Darby (M) Ltd.
Electrical installation: Hwa Fong &
Co. Ltd.
Lifts: main building-China En- gineers Ltd.; annexe- -Paterson Simon & Co. (M) Ltd. Fire-fighting equipment: McAlister
& Co. Ltd.
Spread-acoustic
plaster
ceiling:
Brady's (M) Ltd. Aluminium flag poles: Diethlem &
Co. Ltd.
Waterpump and incinerator: Alli- ance (M) Engineering Co. Ltd.
39933.3
99933.
Internal courtyard in the main office block
42
Far East Architect & Builder February, 1968