SINGAPORE CITY COUNCIL

Address

Lot 584 pt. Kallang Industrial Estate

Lots 187 pt. & 188-1 pt.

Jalan Rembah Kallang Lot 27, Harvey Road

Lot 153-38 Astrid Hill Estate 30, Kim Yam Road Orange Grove Road

Lot 103-108 Holland Road

Lot 209 Queens Road Lot 201-36 Trafalgar Street Lot 45. Tanglin Halt Road Lot 230 Dunearn Road Lot 29-2 Mandalay Road Lot 196-4 Holland Road

North Buona Vista Road Lot 187 Bt. Tunggal Road Lot 118 (6, 7 & 8),

St. Thomas Walk

Singapore

ment

Owner

Architects

Factory Develop

Ng Cheong Ling

Ong Geok Lim

Choon Woh Foundry

The Bank of East Asia Ltd. Hokkien Huay Kuan

Orchard Hotel Ltd.

Madam Aw Cheng Hu

Loh Poh Heng Wing & Co. Ltd.

Sheng Huo Enterprise Ltd. Town & City Properties Ltd. Madam Lee Ah Chik United Development &

Finance Co. Ltd. Tan Pui Yong

Madam Lee Keng Lin &

Madam Liu Kam Wan

Rex Koh Kim Chuan

Robert F. N. Kan

J. Kirkwood

George K. C. Ho Iversen Van Sitteren & Partners George K. C. Ho

William Lim P. W. Wong Chuah Yet Lian Low Ah Long Yang Tai Tye

Yang Tai Tye

Tham Boon Kheng

Ang Kheng Leng

Factory

Description

Two-storey factory

Brass Foundry and office Residence

Four-storey secondary school Alterations to Orchard Hotel

Pair of three-storey semi-detached

dwellings

Two-storey house

Godown

Chocolate factory

30 terrace houses

Two two-storey bungalows

29 terrace houses

Detached houses

18-storey flats (51 dwellings)

Contracts awarded

HONG KONG GOVERNMENT

Construction of fruit & vegetable stalls Shun Shing Building at Valley Road low cost housing Construction Co. estate, Kowloon. $44,434

Site formation for Heung Yee Kuk King Shing Construc- secondary school at Yuen Long, New tion Co. Territories. $68,259

Construction of Tuen Mun San Hui Wing Shing Construc- Government Building, New Territories. tion Co. $162,353

Demolition and sundry works for por- Wing Shing Construc- tions of Blocks 10 & 11 at Chai Wan tion Co. resettlement estate (stage III), Hong

Kong. $12,974

Supply of asbestos cement goods for Tsing Yi Island Indus- Blocks 13 and 14, Ngau Tau Kok tries Ltd. resettlement estate. $176,620

Supply of asbestos cement goods for Tsing Yi Island Indus- Sau Mau Ping resettlement estate, tries Ltd. Block 38 (stage II). $148,619

Supply of metal windows for Sau Mau China Steel Works Ltd. Ping resettlement estate school at-

tached to Block 45 (stage II). $13,800

Supply and laying four En-tout-cas Wing Wah Co. Green "Bitumas" hard tennis courts

at Kowloon Tsai Park (stage II).

$69,975

Supply of metal windows for estate China Steel Works Ltd. school attached to Block E, Shek Pai

Wan resettlement estate. Aberdeen. $13,560

Electrical installation for Blocks G Ip Tim Electrical Co. and H and estate school at Wong Chuk

Hang domestic

low

Aberdeen. $152,000

cost housing,

Supply of dome lights for Queen U-Sing Co.

Elizabeth Hospital, Kowloon. $10,240

Electrical installation for Departmental Au Chow Co.

Quarters, $206,318

New Au Tau,

Territories.

Supply and installation of sliding and Deacon & Co., Ltd. folding metal doors for Tai Po fire

station, New Territories. $24,490

Supply of metal windows for estate China Steel Works Ltd. school attached to Block 3 at Ngau

Tau Kok resettlement estate. $13,200

Supply and laying of asphalt roofing British Orient Ltd. for Block E. Shek Pai Wan resettle-

ment estate, Aberdeen. $22,552

Supply and laying of asphalt roofing British Orient Ltd. for Shek Lei resettlement estate (area B) block II. Tsuen Wan, New Terri-

tories. $13,373

Far East Architect & Builder December, 1966

Supply and laying of asphalt roofing British Orient Ltd. for officers' quarters at Stanley Prison,

Hong Kong. $127,718

Construction of waiting shelters and Wing Shing Construc- re-surfacing of platform at Tai Po tion Co. market and Tai Po Kau stations of the Kowloon-Canton Railway. British Section.

$129,774

Non-destructive testing and inspec- The Motherwell_Bridge tions of the proposed 42 in. cross & Engineering Co. harbour main. $130,050

Construction of Yuen Long roads & Truly Construction Co. drains, stage I-north of Yuen Long

Main Road. $1,474,623

Manufacture of cast iron intake Wang Tak Engineering screens and guides for Wan Chai salt and Shipbuilding Co. water pumping station. $26,267

Ltd.

$266,366

Stabilization of slopes for Kennedy Yick Hing Construction services reservoir, Shek Pik water Co. scheme.

Construction of roads, drains and Chi Fuk Construction surfaces at Lei Muk Shu resettlement Co.

estate, stage II.

$1,892,930

Reconstruction of Peak Road at Sunfok Construction Magazine Gap. $219,693

Co.

Construction of footpath from Tai Sun Kee Construction Long to Sai Wan, Sai Kung. $18,600 Co.

Construction of footpaths and bridges Chik Fook Kee Build- from Lok Wo Sha to Sai O and Nai ing Contractor Chung, Sai Kung. $12,036

Construction of shelters at Kam Tei Lee Shun Construction

Co. Market.

$12,889

Construction of two 5-seat aqua Lee Shun Construction privies at Lau Fau Shan, Yuen Long. Co. $20,830

Construction of stream embankment Lee Shun Construction at Hung Shui Kiu. $17,849

Co.

Construction of domestic resettlement Shun Hing Co.

housing blocks 1, 2 & 3 and estate

school

at Shek Lei resettlement

estate (stage 1) area A. $6,924,639

Construction

of drains, roads and Cheong Hing Construc- surfaces at Ham Tin resettlement tion Co. estate, stage III. $451,506

Maintenance and construction of Fook Lee & Co. roads, bridges and drainage works for

Western, Wan

Chai and

Peak Dis-

tricts, Hong Kong Island-1966/68. $3,500,000 per annum

Reconstruction of road and nullah Ping Kee Construction Stone Nullah Lane. $146,720

Co.

75

Share This Page