Jabi regulator

by the Pelubang barrage. Flow in the canals is controlled by a series of regu- lators placed at four to five mile inter- vals.

The main canals cross three rivers through inverted siphons and a fourth by a reinforced concrete aqueduct. Some canal offtakes are similar in de- sign to the regulators, which have oil- hydraulically operated overshot gates, but most are piped with manually operated control by sluice gates.

A control scheme ensures that the best use is made of available water sup- plies, including run-off from the catch- ments below Pedu dam and rainfall on the irrigated area. Substantial storage for these uncontrolled supplies is avail- able on the padi fields themselves, and draw-off from the Muda-Pedu reservoir is reduced to a minimum.

Data are transmitted by telemetry and teleprinter to and from a control centre where processing is effected by a computer. In order to arrange the most advantageous distribution of water by the canal system, the com- puter arrives at the principal gate set- tings and canal levels required.

Construction of the project was completed on schedule at a total cost of approximately M$210 million.

SHERATON EMERSON'S 1971

(BANGKOK) HOTEL

TRANE

YET ANOTHER

QUIET KOOL

A PRODUCT OF EMERSON

Multi-Mount

Air Conditioners

RADIO

00002

Sole agent in Thailand.

ALLIED ENGINEERING CO., LTD.

14 Sap Road, Bangkok. Tel: 38151, 34029

Far East BUILDER, April 1971

multi mount installation system □ certified cooling capacities

from 6,500 to 29,000 BTU's twin air direction wheels automatic adjustable thermostat filtered fresh air □ two speed fan operation pushbutton controls easy access slide out filter zinc coated steel parts.

SOLE DISTRIBUTOR

SIAM UNITED ENTERPRISES CO.,LTD. 369 Luang Road Opp.Central Hospital Tel:224285

Show Room 499-5-6 Rajatavee Circle, Perchburi Rd. Tel. 815668

43

Share This Page