South-west elevation

formwork, and therefore the concrete surface, was not damaged. To ensure uniform colouring and finish, the in- gredients and mix of concrete were carefully controlled.

In designing the services a main concern was to reduce to a minimum the unsightly presence of piping, wiring and controls. With the approval of the utility companies, risers and main controls were compacted inside

two small all-purpose ducts, so design- ed that each company has ready access to its own services.

Costs

The building took 24 months to complete, or just under a month for each floor (floor area each floor (floor area

-

8,870 sq.ft.). Total cost of the building, com- plete with external work and access road, was just over HK$4,100,000.

Rates per foot super were approx- imately as follows:

Substructure Superstructural work excluding finishes, services, etc. Finishes and

decorations Internal services; lifts, plumbing, electrical installation

External work and

services

Miscellaneous

- $ 1.50 (8.02%) - $7.00 (37.44%)

- $ 3.40 (18.18%)

- $ 3.50 (18.72%)

- $ 0.70 ( 3.74%)

Total

$ 2.60 (13.90%)

HK$18.70 (100.00%)

BAL WCWC BAL BAL. WC WC. BAL.

KIT KIT

KT KIT. L

L.R.

L. R.

L.A.

L. R.

COA R 1 ►

O R

L.A.

L. R.

L.R.

L.R.

PLAY AREA

KIT KIT

BAL.

Typical floor

BAL

SAL.

BAL

Far East BUILDER, April 1970

[ E ] I ]

UP

Contractors

Main contractors for the stage II building were Hsin Chong & Co. Ltd. Sub-contractors and suppliers in-

cluded:

GEC-AEI Hongkong Ltd. - Fiam

Lifts

Gilman & Co. Ltd. electrical in- stallations

Dodwell & Co. Ltd. - Key Terrain plastic piping

Precast Products Ltd.

baked enamel louvres

Naco

Dreyer & Co. Ltd. Loewe salt and fresh water pumps