LONGITUDINAL SECTION OF OUTFALL TO OUTLET CULVERTS.
two separate boilers and turbine generators of equal capacity.
Boilers, now being installed, are supplied by Babcock and Wilcox, Ltd., under sub-contract to English Electric. Turbine generators, instal- lation of which is just commencing. are being supplied by English Electric and all cabling will be done by Bri- tish Insulated Calenders Cables, Ltd. under subcontract to English Electric.
Switchgear is being provided by Reyrolles, Ltd. under direct contract to HKEC.
The reinforced concrete chimney, with imported brick lining, is by Tile- mans (Australia) under sub-contract to the main contractors, The chim- ney is expected to be completed in the next few months, well ahead of programme.
The men in charge of constructing the new power station are:
HEC C. A. Britton, general manager: H. Topley, assistant mana- ger generation and M. Belanovsky, supervisor.
17
English Electric W. J. Farnfield, project manager.
Wimpey D. Russell, agent and registered architect; and D. Vipond. deputy agent.
Wimpey have six UK staff on site and employ some 260 local people, direct and under sub-contract. Con-
72
Hong Kong Electric Company, Limited
PT.
Reyrolles (Switchgear)
English Electric (Main Contractors)
George Wimpey (Civil, Design & Construction)
Babcock &
Wilcox (Boilers)
I B.I.C.C.
(Cables)
struction plant in use on the site in- cludes a 15 ton Butters Derrick crane; a 545 NCK crawler/crane (for all steelwork erection): a 22 RB crane/excavator: Consolidated Pneu- matic 600 c.f.m. compressors: British Crane and Hoist Co. hoists: and McKiernan Terry piling equipment.
The overall cost of the 'C' station development is about HK$80 mil- lion, some $24 million being for the civil works. The contract period for the civil works is 32 months from September 1963, but it is expected that the bulk of the work on site will be completed by the end of this year.
Sub-contractors
Sub-contractors to George Wimpey and Co. Ltd., include:
Green Island Cement Co., Ltd.
Part of switchgear house, showing shuttering to cell walls
English Electric
(Turbines &
C. W. Pumps)
Tileman (Chimney)
cement; Charles Corn, and Lee On Kee
aggregates; Vibro Piling Co., Ltd. piling; Shin Kee Construction Co., Ltd. superstructure (form- work, scaffolding and masonry): Kwong Hing Co. foundations (ex- cavations and reinforcement): Wing Tai Cheung Co., Ltd. timber; South Durham Iron and Steel Co., Ltd. structural steel and steel sheet piling: H. H. Robertson (Ex- port) Ltd. roof decking; Nissho Co., Ltd., Japan
reinforcement: Colt Ventilation and Heating, Ltd.- ventilation; Fok Wah Enterprises bricks; Ching Tai Cement Products, Ltd. concrete blocks: Davie Boag and Co., Ltd. BRC fabric; Univer- sal Engineering temporary timber piling: Lee On Kee
site transport: Hopes Windows, Ltd. windows: Arnold Trading Co., Ltd. and Stanton Ironworks, Ltd. cast iron pipes: British Paints, Ltd.
——
J
paint; and
Acrow Engineers (Asia) Ltd. scaf- folding and formwork.
New station site
Late last month it was announced that the Hong Kong Government had agreed in principle to grant a site on Ap Lei Chau Island to the Hong Kong Electric Co., Ltd. for the build- ing of a new power station to facili- tate the company's expansion plans.
The site, covering about 540,000 sq. ft. at the western tip of the island. is to be granted to the company in exchange for an area of about 82,000
sq. ft. adjacent to the company's
North Point power station in Electric Road.
This area in Electric Road is re- quired by Government in the future in connection with proposals for a second desalination plant. These pro- posals are at present under con- sideration.