Sub- head

Head 63-PUBLIC WORKS NON-RECURRENT

Estimated Expendi-

Works completed, cancelled or curtailed Contd.

Estimate

Revised Estimate

Estimate

ture to 31st March 1961

1961-62

Chai Wan Access Road, Stage I

Road from Shek Kip Mei to Tai Hang Tung,

Stage II

2,000,000 | 2,020,000

2,020,000

300,000 152,000 152,000

Car Park, filling station and children's play-

ground, Macdonnell Road

215,000

214,998 214,998

Tai Hang Road/Wong Nei Chong Gap Road/

Stubbs Road junction, Stage I..

550,000

492,098 492,098

Kennedy Road improvement (near Monmouth

Path)

400,000

399,729 399,729

Ice House Street reconstruction (Lower Albert

Road to Queen's Road)

400,000

372,843 372,843

Broadwood Road widening (Link Road to

Wong Nei Chong Road).

360,000

332,436

332,436

Barker Road/Stubbs Road junction..

100,000

85,232

85,232

Improvements to Pollock's corner and widening

of Tanderagee Road

154,000

151,085

151,085

Tai Hang Tung Road widening

116,000

116,000

Waterloo Road reconstruction (Nathan Road to

Railway Bridge)

500,000

480,000

480,000

Waterloo Road/Argyle Street/Nairn Road

junction......

180,000

180,000

Nan Chang Street reconstruction

750,000 527,000

527,000

Ma Tau Wei Road

495,000

473,000

473,000

Tam Kung Road (Access to Kai Tak Airport)

250,000

242,000 242,000

Ping Tse Road, N.T.

345,000

339,000

339,000

Castle Peak Road improvements:

Bridge at 33 Milestone (Beas River)

500,000

500,000

Bridge at 33 Milestone (Dodwell's Ridge)

230,000

230,000

Ching Lung Tau Causeway

1,000,000

750,000 750,000

Texaco Road, Stage I (Castle Peak Road to

Sha Tsui Road)

570,000

Anderson Road (including Po Lam Road) Route T.W.S.K. improvements..

498,000 498,000 470,000 409,000

409,000

140,000

95,000

95,000

Route I improvements, Stage I, (T.W.S.K. to

Route II)

500,000

500,000

Shek Wu Hui, roads and drainage, Stage II Yau Ma Tei intercepting sewer and outfall... Jordan River Valley, extension of nullah (Ngau

Tau Kok Road to Kwun Tong Road).. Fung Wong Village, drainage and roads. Sha Tau Kok, drainage and roads Sha Tin Valley, drainage and roads. Kwai Chung Nullah, New Territories Stormwater culvert on southern boundary of

R.A.F. Area, Ngau Chi Wan.. Nullah upstream of Box Culvert No. 1, Tsuen

Wan New Territories

997,000

997,000

4,250,000 4,211,900 | 4,211,900

700,000

700,000

500,000

450,000

450,000

300,000

300,000

1,700,000 1,663,000 | 1,663,000

555,000

342,570

342,570

300,000

212,000 212,000

110,000

82,800

82,800

Tsuen Wan Main Streamcourse, Box Culvert

No. 1: Kwan Mun Hau Village to seaward of Sha Tsui Road..

400,000

350,000

350,000

Nullah Decking: Bowrington Canal (site for

filling station)

200,000

134,680

134,680

Central Reclamation, Stage III

2,500,000

2,264,977 2,264,977

Hung Hom Reclamation, Stage III.

1,467,400 | 1,467,400

Tsuen Wan Sea Wall, Stage II..

2,800,000

2,326,148 2,326,148

Cheung Chau Ferry Pier and Reclamation..

430,000

370,877

370,877

Landing facilities at Tsuen Wan, Industrial

Zone 1

350,000

Tung Chung Pier.

278,655 278,655 400,000 392,000 392,000

Ma Wan Pier

200,000 175,000

175,000

Development Schemes:

New rifle and grenade range at Lo Wu

Bridge over railway at Nairn Road.

Police small arms range.

Ho Man Tin Development, investigations

804,000 779,600

779,600

1,300,000

1,300,000

350,000

350,000

150,000 58,000

58,000

123

CA

Share This Page